Eyesys Mini-B/A Gauge Controller
3
❑
At minimum, +24V power and Power Ground connections are required. Pin 7,
“Power and Status Ground” is required for safe operation of the system. Shielded
cable is required for CE and FCC compliance. See “EMC Warnings”, Page ii.
❑
Setpoint contacts are Normally Open contact closures.
❑
See “Remote Control Lines” on page 10, for usage of status and control pins.
Table 4
RS-422 and RS-485 Options
RS-422 Option
RS-485 Option
1
Degas ON/OFF control
1
Degas ON/OFF control
2
Degas Status output
2
Degas Status output
3
Emission Status output
3
Emission Status output
4
Setpoint 1 contact
4
Setpoint 1 contact
5
Setpoint 2 contact
5
Setpoint 2 contact
6
+24V Power
6
+24V Power
7
Power and Status Ground
7
Power and Status Ground
8
RS-422 Tx–
8
RS-485 T–
9
RS-422 Rx–
9
Pressure Signal Output
10
RS-422 Rx+
10
Signal Ground
11
Emission ON/OFF
11
Emission ON/OFF
12
Setpoint 1 contact
12
Setpoint 1 contact
13
Emission control, pulse
13
Emission control, pulse
14
RS-422 Tx+
14
RS-485 T+
15
Setpoint 2 contact
15
Setpoint 2 contact
Summary of Contents for Eyesys Mini-B/A
Page 12: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 14: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 28: ...Eyesys Mini B A Gauge Controller 14 Table 8 Gas Correction Factors ...
Page 29: ...Eyesys Mini B A Gauge Controller 15 Table 7 Gas Correction Factors continued ...
Page 30: ...Eyesys Mini B A Gauge Controller This page intentionally left blank ...
Page 39: ...Returned Materials Report ...
Page 40: ......
Page 41: ......