![Agilent Technologies 85103F Installation Manual Download Page 14](http://html.mh-extra.com/html/agilent-technologies/85103f/85103f_installation-manual_2867932014.webp)
4
85103F Performance Upgrade Installation Manual
The 85103F Upgrade Package (8510A/B to 8510C)
Installing the Upgrade
Procedure Overview
Step 1. Check the upgrade package contents.
Refer to
. If an item is missing, refer to
“Contacting Agilent” on page iv
for
assistance.
Step 2. Assemble items not included in the upgrade package.
If needed, obtain the required items listed in
for your upgrade that are not
supplied in the package.
Step 3. Be sure you have a static safe work station.
Check for the following:
• The static mat sits on a clean, flat, sturdy surface.
• The static mat has a connection to earth ground.
• The static mat has a wrist strap connected to it.
Step 4. Familiarize yourself with the upgrade requirements.
Refer to
“Installing the Upgrade” on page 2
for an overview of the required upgrade steps.
Step 5. Follow the upgrade instructions.
Follow the detailed instructions provided, beginning with
to install and check your upgrade installation.
Step 6. Recycle/dispose of the replaced 85101A/B display/processor.
Recycle or dispose of the 85101A/B display/processor according to your state or local
requirements. The battery on the A7 I/O board and the A11 display (CRT) may have
special requirements. When disposing of the cathode ray tube (CRT display), observe the
following precautions:
WARNING
The CRT can pose a shock hazard if not properly discharged.
Explosion or implosion of the CRT may cause personal injury.
Only a properly trained individual should release the vacuum.
Summary of Contents for 85103F
Page 10: ...x Contents ...
Page 11: ...1 The 85103F Upgrade Package 8510A B to 8510C ...