
Installing Sampling Valves on an Agilent 6850 Gas Chromatograph
Installing Sampling Valves
15
Installing an Air Control Valve for a Diaphragm-Type Control Valve
to install a diaphragm air
control valve.
Table 4
Installing an air control valve for a diaphragm-type control valve
Step
Action
Notes
1
Install the air control valve.
a
If present, remove the rectangular
cover plate on the back of the lid.
b
Attach the torque plate to the inside of
the cover plate with one screw. Do not
tighten.
c
Mount the cover plate/torque plate
assembly on the outside of the lid with
two screws.
d
Loosen the two screws on the base of
the air control valve.
Torque plate
Connector
Gas fitting
Tubing to valve box
Mounting screws
Summary of Contents for 6850 GC
Page 1: ...Agilent Technologies Agilent 6850 GC Sampling Valves G2654A G2659A G2667A G2672A Installation ...
Page 19: ...Installing Sampling Valves on an Agilent 6850 Gas Chromatograph Installing Sampling Valves 19 ...
Page 20: ... Agilent Technologies Inc Printed in USA May 2012 Agilent Technologies G2630 90160 ...