
6
Installation Guide: Flame Ionization Detector (FID)
4
While positioning the detector into the cavity, use both
supplied insulation and removed oven insulation to pack
around the bottom and sides of the detector. The goal is to fill
all voids around the detector body as it is placed into the
cavity.
5
Partially tighten the four pallet screws with a T-20 Torx
screwdriver, then tighten them evenly.
Pallet
Captive screws (4)
(Flow module
not shown)