
3-19
Testing Performance
To verify trigger sensitivity
Test External Trigger Sensitivity
Verify the external trigger sensitivity at these settings:
500 MHz (54642A/42D), <200 mV
p-p
350 MHz (54641A/41D), <200 mV
p-p
100 MHz (All models), <100 mV
p-p
1
Use the power splitter to connect the calibrator to both the channel 1
input and the external trigger input. The Ext Trigger input is on the rear
panel of the mixed-signal oscilloscope.
2
Set up the oscilloscope.
a
Set channel 1
Coupling
to
DC
and
Imped
to
50 Ohm
.
b
Press the
Mode/Coupling
key and set
Coupling
to
DC
c
In the
Mode/Coupling
menu, press the
External
softkey, then press the
Imped
softkey and set impedance to
50 Ohm
.
3
Change the output of the calibrator to 500 MHz for the 54642A/42D or
350 MHz for the 54641A/41D, and set the amplitude to 400 mV
p-p
.
The power splitter divides the 400 mV
p-p
so that 200 mV
p-p
is applied to each
of the oscilloscope inputs.
4
Press the
Autoscale
key.
5
Press the Trigger
Edge
key, then press the
Ext
softkey to set the trigger
source to
external trigger.
6
Check for stable triggering, and adjust the trigger level if necessary.
7
Record the results as Pass or Fail in the Performance Test Record.
If the test fails, see the “Troubleshooting” chapter. Then return here.
8
Change the output of the calibrator to 100 MHz and set the amplitude
to 100 mV
p-p
.
9
Check for stable triggering, and adjust the trigger level if necessary.
10
Record the results as Pass or Fail in the Performance Test Record.
If the test fails, see the “Troubleshooting” chapter. Then return here.
service.book Page 19 Wednesday, August 28, 2002 3:25 PM
Summary of Contents for 54641A
Page 4: ...iv service book Page iv Wednesday August 28 2002 3 25 PM ...
Page 7: ...1 General Information ...
Page 24: ...1 18 ...
Page 25: ...2 Preparing the Oscilloscope for Use service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 45: ...3 Testing Performance service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 66: ...3 22 service book Page 22 Wednesday August 28 2002 3 25 PM ...
Page 67: ...4 Calibrating and Adjusting service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 76: ...4 10 service book Page 10 Wednesday August 28 2002 3 25 PM ...
Page 77: ...5 Troubleshooting service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 90: ...5 14 service book Page 14 Wednesday August 28 2002 3 25 PM ...
Page 91: ...6 Replacing Assemblies service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 107: ...7 Replaceable Parts service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 114: ...7 8 service book Page 8 Wednesday August 28 2002 3 25 PM ...