![AGI Westeel EasyFlow2 100 Series Assembly & Installation Manual Download Page 23](http://html1.mh-extra.com/html/agi/westeel-easyflow2-100-series/westeel-easyflow2-100-series_assembly-and-installation-manual_2867013023.webp)
BU-0101704 R3
23
5. Pre-Assembly
Before continuing, ensure you have completely read and understood this manual’s
Safety section, in addition to the safety information in the section(s) below.
5.1. Check Shipment
Unload the bin unload parts at the assembly site and compare the packing slip to the shipment. Ensure that all
items have arrived and that none are damaged. Take pictures of shipments prior to or just after unloading if
there are any damaged parts.
Report missing or damaged parts immediately to ensure that proper credit is received from Westeel or your
representative, and to ensure that any missing parts can be shipped quickly to avoid holding up the assembly
process.
Important
Do not assemble or install damaged components.
5.2. Before You Begin
Before you assemble the bin unload:
• Familiarize yourself with all the sub-assemblies, components, and hardware that make up the equipment.
• Have all parts and components on hand, and arrange them for easy access.
• Separate the hardware (bolts, nuts, etc.) and lay them out into groups for easier identification during
assembly.
5.3. Required Materials
The materials below are not supplied and must be purchased separately. Contact your local dealer for
assistance, if required.
• shim steel of various thicknesses
• four 1/2” concrete anchor bolts (for anchoring the underfloor auger to the floor) (see
and
).
Figure 5.
Wedge Concrete Anchor Bolt
Figure 6.
Epoxy Bonding Concrete Anchor Bolt
• 2 corrugated sponge strips (for bin adapter)
EASYFLOW2 (100 SERIES) – FARM TUBE BIN UNLOAD SYSTEM