5.11. TEST START-UP
1. Remove covers for visual checks.
2. Have personnel ready to shut down immediately.
3. Visually check head section.
4. Visually check tail section and v-plow.
5. Visually check intermediate trunking sections.
6. Test operate while personnel visually check all sections.
7. Start-up with small material load, checking visually.
8. Operate with 25% load, checking visually.
9. Operate with 50% load, checking visually.
10. Operate with 75% load, checking visually.
11. Operate with full load, checking visually.
5.12. FINAL INSPECTION DURING OPERATION
1. Remove covers for visual checks with personnel ready to shut down
immediately if there is a problem.
2. The conveyor should be inspected from the head section to the tail section to
be sure everything is operating properly.
3. Make sure to inspect belt tracking, loading, discharging, clearances, self-
cleaning, reloading, etc.
4. Visually check head section.
5. Visually check tail section and v-plow.
6. Visually check intermediate trunking sections.
7. Operate while personnel visually check all sections.
Important:
Regular inspections and preventative maintenance are very important to the
proper operation of a Hi Roller Conveyor.