
Quality Components for Fire Sprinkler Systems
5
AGF Manufacturing • Phone: 610-240-4900 • [email protected] •
www.agfmfg.com
Model 5100ALBV OPERATING INSTRUCTIONS
Power is supplied to the Model 5100ALBV by a 9V battery (default) or by installing
a 12-24VDC external hard wire (See page 6). Optional 110V plug is also available.
NOTE:
The 5100ALBV can draw up to 100mA during operation. Ensure the power
supply is sized appropriately for this and any other loads on the same circuit.
Battery Operation:
1. Remove the four screws on the alarm box and
take the cover off.
2. For battery operation, check to make sure the
Voltage Jumper is on the front two pins as
shown in Image 1 (Fig. A).
3. Install a 9V battery as shown in Image 2.
NOTE:
When the battery begins to run low the
alarm will chirp and the LED will double flash,
or flash yellow on older models.
4. Place the 9V battery under the circuit board
as shown in Image 3.
5. Replace the cover with the 4 screws.
+V
-V
COM
TEMPERATURE
JUMPER
VOLTAGE
JUMPER
N.O.
N.C.
Image 1
Image 2
Image 3
Fig. A
VOLTAGE
JUMPER