4-4.10
Harrows
a.
Coil Tine (3 and 4 bar): Position the spring
anchor bolt to get the desired pressure on the
harrow teeth. Position bolt in the harrow link-
age assembly so that the harrow assembly is
level. Place the stop bolt to get the desired
angle on the harrow teeth
(See Figure 4-5).
b.
Spike Harrow (3 and 5 bar): Adjust the har-
row up or down until the lower portion of the
harrow frame is level with the ground when
the unit is at working depth.
(See Figure 4-6).
c.
Spike Harrow (Tilloll style): The harrow as
assembled is set for a working depth of 3 to 5
inches. Adjust the harrow up or down to
change the working depth. Spring tension can
be increased by reducing the number of chain
links between spring and anchor bolts. Adjust
the angle of the harrow teeth placing clevis
pin and cotter pin in one of three holes in the
harrow adjustment brackets.
(See Figure
4-6
Figure 4-5 Coil Tine Harrow
Summary of Contents for Glencoe SF4800
Page 1: ...Glencoe MODEL SF4800 SOIL FINISHER OPERATOR S MANUAL Form No 79019152 March 2001...
Page 2: ......
Page 3: ...MODEL SF4800 SOIL FINISHER OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO...
Page 4: ......
Page 11: ...2 4 Figure 2 1 11 4 Shank Placement Assembly...
Page 12: ...2 5 Figure 2 2 14 0 Shank Placement Assembly...
Page 13: ...2 6 Figure 2 3 16 8 Shank Placement Assembly 1 of 2...
Page 14: ...2 7 Figure 2 4 16 8 Shank Placement Assembly 2 of 2...
Page 15: ...2 8 Figure 2 5 19 4 Shank Placement Assembly 1 of 2...
Page 16: ...2 9 Figure 2 6 19 4 Shank Placement Assembly 2 of 2...
Page 17: ...2 10 Figure 2 7 22 0 Shank Placement Assembly 1 of 2...
Page 18: ...2 11 Figure 2 8 22 0 Shank Placement Assembly 2 of 2...
Page 19: ...2 12 Figure 2 9 24 8 Shank Placement Assembly 1 of 2...
Page 20: ...2 13 Figure 2 10 24 8 Shank Placement Assembly 2 of 2...
Page 21: ...2 14 Figure 2 11 27 4 Shank Placement Assembly 1 of 2...
Page 22: ...2 15 Figure 2 12 27 4 Shank Placement Assembly 2 of 2...
Page 23: ...2 16 Figure 2 13 30 0 Shank Placement Assembly 1 of 2...
Page 24: ...2 17 Figure 2 14 30 0 Shank Placement Assembly 2 of 2...
Page 25: ...2 18 Figure 2 15 32 8 Narrow Frame Shank Placement Assembly 1 of 2...
Page 26: ...2 19 Figure 2 16 32 8 Narrow Frame Shank Placement Assembly 2 of 2...
Page 27: ...2 20 Figure 2 17 32 8 Wide Frame Shank Placement Assembly 1 of 2...
Page 28: ...2 21 Figure 2 18 32 8 Wide Frame Shank Placement Assembly 2 of 2...
Page 29: ...2 22 Figure 2 19 35 4 Shank Placement Assembly 1 of 2...
Page 30: ...2 23 Figure 2 20 35 4 Shank Placement Assembly 2 of 2...
Page 31: ...NOTES 2 24...
Page 33: ...3 2 Figure 3 1 Frame Assembly 30 to 35...
Page 35: ...3 4 Figure 3 2 Rockshaft Installation Frame Figure 3 3 Rockshaft Installation Frame 30 and 35...
Page 37: ...3 6 Figure 3 5 Wing and Wing Extensions 17 35 Models...
Page 40: ...3 9 Figure 3 9 Fold Cylinder Bracket 17 through 27...
Page 41: ...3 10 Figure 3 10 Fold Cylinder Bracket 30 and Larger...
Page 42: ...3 11 Figure 3 11 Installation of Fittings in Manifold...
Page 43: ...3 12 Figure 3 12 Installation of Shanks and Clamps...
Page 45: ...3 14 Figure 3 14 Spring Shank Assembly Figure 3 15 Ratchet Jack Installation...
Page 46: ...3 15 Figure 3 16 Disc Gang Hydraulic Assembly...
Page 49: ...3 18 Figure 3 19 Leveling Assembly Installation...
Page 51: ...3 20 Figure 3 20 Warning Light Installation...
Page 53: ...3 22 Figure 3 21 Hydraulic Radius Rod...
Page 54: ...3 23 Figure 3 22 Rear Hitch Assembly Option...
Page 57: ...NOTES 3 26...
Page 64: ...4 7 Figure 4 6 Spike Harrow 3 and 5 Bar Figure 4 7 Spike Harrow Tilloll Style...
Page 67: ...4 10 Figure 4 11 Lubrication Schedule...
Page 69: ...NOTES 4 12...
Page 72: ...NOTES 5 3...
Page 73: ......
Page 74: ......
Page 75: ...Glencoe AGCO CORPORATION 4205 River Green Parkway Duluth Georgia 30096 Printed in U S A...