4-4.4
Set the unit working depth.
a.
To adjust the depth, lower unit to the ground
and completely retract the lift cylinders.
b.
Screw the adjustment rod in to decrease the
working depth, out to increase the working
depth.
(See Figure 4-3).
CAUTION
THE TWO ADJUSTMENT RODS ON
THE MAIN FRAME MUST BE AD-
JUSTED EQUALLY OR PERMANENT
EQUIPMENT DAMAGE WILL RESULT.
IMPORTANT
IT MAY BE NECESSARY TO ADJUST THE
WINGS DIFFERENT THAN THE MAIN FRAME
FOR THE UNIT TO OPERATE LEVEL.
4-4.5
Always lift the Soil Finisher completely
out of the ground before turning or backing.
This prevents shank or disc damage or dam-
age to their respective mounting brackets.
4-4.6
Reduce speed at field ends, and lift the
Soil Finisher completely out of the ground
before turning.
4-4.7
After a few hours of operation, check all
bolts for tightness, especially the shank U-
bolts and pivot bolts. Tighten wheel lug bolts
to 90 ft-lbs of torque. Tighten any loose bolts
to the torques shown in
4-4
Figure 4-3 Adjusting Unit Working Depth
Summary of Contents for Glencoe SF4800
Page 1: ...Glencoe MODEL SF4800 SOIL FINISHER OPERATOR S MANUAL Form No 79019152 March 2001...
Page 2: ......
Page 3: ...MODEL SF4800 SOIL FINISHER OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO...
Page 4: ......
Page 11: ...2 4 Figure 2 1 11 4 Shank Placement Assembly...
Page 12: ...2 5 Figure 2 2 14 0 Shank Placement Assembly...
Page 13: ...2 6 Figure 2 3 16 8 Shank Placement Assembly 1 of 2...
Page 14: ...2 7 Figure 2 4 16 8 Shank Placement Assembly 2 of 2...
Page 15: ...2 8 Figure 2 5 19 4 Shank Placement Assembly 1 of 2...
Page 16: ...2 9 Figure 2 6 19 4 Shank Placement Assembly 2 of 2...
Page 17: ...2 10 Figure 2 7 22 0 Shank Placement Assembly 1 of 2...
Page 18: ...2 11 Figure 2 8 22 0 Shank Placement Assembly 2 of 2...
Page 19: ...2 12 Figure 2 9 24 8 Shank Placement Assembly 1 of 2...
Page 20: ...2 13 Figure 2 10 24 8 Shank Placement Assembly 2 of 2...
Page 21: ...2 14 Figure 2 11 27 4 Shank Placement Assembly 1 of 2...
Page 22: ...2 15 Figure 2 12 27 4 Shank Placement Assembly 2 of 2...
Page 23: ...2 16 Figure 2 13 30 0 Shank Placement Assembly 1 of 2...
Page 24: ...2 17 Figure 2 14 30 0 Shank Placement Assembly 2 of 2...
Page 25: ...2 18 Figure 2 15 32 8 Narrow Frame Shank Placement Assembly 1 of 2...
Page 26: ...2 19 Figure 2 16 32 8 Narrow Frame Shank Placement Assembly 2 of 2...
Page 27: ...2 20 Figure 2 17 32 8 Wide Frame Shank Placement Assembly 1 of 2...
Page 28: ...2 21 Figure 2 18 32 8 Wide Frame Shank Placement Assembly 2 of 2...
Page 29: ...2 22 Figure 2 19 35 4 Shank Placement Assembly 1 of 2...
Page 30: ...2 23 Figure 2 20 35 4 Shank Placement Assembly 2 of 2...
Page 31: ...NOTES 2 24...
Page 33: ...3 2 Figure 3 1 Frame Assembly 30 to 35...
Page 35: ...3 4 Figure 3 2 Rockshaft Installation Frame Figure 3 3 Rockshaft Installation Frame 30 and 35...
Page 37: ...3 6 Figure 3 5 Wing and Wing Extensions 17 35 Models...
Page 40: ...3 9 Figure 3 9 Fold Cylinder Bracket 17 through 27...
Page 41: ...3 10 Figure 3 10 Fold Cylinder Bracket 30 and Larger...
Page 42: ...3 11 Figure 3 11 Installation of Fittings in Manifold...
Page 43: ...3 12 Figure 3 12 Installation of Shanks and Clamps...
Page 45: ...3 14 Figure 3 14 Spring Shank Assembly Figure 3 15 Ratchet Jack Installation...
Page 46: ...3 15 Figure 3 16 Disc Gang Hydraulic Assembly...
Page 49: ...3 18 Figure 3 19 Leveling Assembly Installation...
Page 51: ...3 20 Figure 3 20 Warning Light Installation...
Page 53: ...3 22 Figure 3 21 Hydraulic Radius Rod...
Page 54: ...3 23 Figure 3 22 Rear Hitch Assembly Option...
Page 57: ...NOTES 3 26...
Page 64: ...4 7 Figure 4 6 Spike Harrow 3 and 5 Bar Figure 4 7 Spike Harrow Tilloll Style...
Page 67: ...4 10 Figure 4 11 Lubrication Schedule...
Page 69: ...NOTES 4 12...
Page 72: ...NOTES 5 3...
Page 73: ......
Page 74: ......
Page 75: ...Glencoe AGCO CORPORATION 4205 River Green Parkway Duluth Georgia 30096 Printed in U S A...