Port Leveling
Once the ports are level, the heat exchanger should be adjusted so it will drain properly. This is
done by adjusting the ball feet to establish a slope from end to end. Figure 5 shows a press adjusted to drain
forward to the fixed end.
Figure 5
Frame Adjusted to Drain to Fixed End
Consult your onsite Plant Engineer or Project Manager to determine how much slope and which
direction (toward the fixed end or follower) is appropriate for your installation.