RT
Regen
Time
-2:00-
This sets the time that the regeneration
cycle will start. This process can take up
to 2 hours depending on system size and
configuration, so schedule it when water
will not be used. It is common to set to
run when everyone is asleep or out of
the house, and ensure it does not conflict
with any other systems you may have.
BW Backwash
10
This sets the length of the backwash
portion of the cycle. During this cycle
water flows through the system in
reverse to lift the resin and rinse off
accumulated contaminants, with a
strong flow of water going out the drain
line. Reducing this cycle can lead to
reduced resin life and premature system
failure. For very dirty water longer times
may be needed.
BD
Brine
Draw
60
This sets the length of the brine draw
portion of the cycle. During this cycle
the water from the brine tank is rinsed
slowly through the resin tank to
regenerate the resin. A slow flow of
water will go down the drain during this
cycle, and the brine tank will be
emptied.
-Please note:-
The brine tank
will typically empty fairly quickly, with
significant time remaining in the cycle,
this is normal as the remaining portion
of the cycle is used to saturate the resin
with the solution to ensure effective
regeneration.
16 of 28