19
Commissioning
EN
PrimoTherm® Floor
6
Commissioning
Prerequisite for commissioning is a complete installation of all hydraulic and
electrical components.
1. Perform a tightness test as per EN 14336.
2. Verify tightness of the components of the system.
- Adapt the test pressure and the test duration to the corresponding
installation and the corresponding operating pressure.
6.1
Commissioning the product
3. Push the hose shipped
with the product onto the
vent screw.
4. Fill and flush the system.
5. Apply pressure to the sys-
tem.
6. Open the vent screw by a
maximum of one turn.