33
Maintenance
AFA 11
EN
8.2
Maintenance activities
8.2.1
Cleaning the probes
1. Remove slightly adhesive liquids from the probe with a dry, lint-free
cloth.
The probe must be replaced in the case of strongly adhering pollution (for
example, crystal salts or adhering oil).
8.2.2
Replacing the relay fuse F2
DANGER
ELECTRIC SHOCK CAUSED BY LIVE PARTS
•
Disconnect the mains voltage supply before performing the work and ensure
that it cannot be switched on.
Failure to follow these instructions will result in death or serious injury.
Verify that the mains voltage of the device and the relay contact is inter-
rupted and cannot be switched on.
1. Open the control unit, see Page 18.
2. Remove the transparent cover from the relay fuse F2 (see chapter
3. Fit a new relay fuse F2.
4. Refit the transparent cover.
5. Connect the flat cable to the connector.
6. Close the control unit.
7. Apply mains voltage.
Summary of Contents for AFA 11
Page 12: ...11 Produktbeschreibung AFA 11 DE 4 2 Abmessungen 60 mm 65 mm 100 mm 188 mm 166 mm ...
Page 23: ...2 3 1 4 5 22 Montage DE AFA 11 2 Schließen Sie das Signal teil ...
Page 47: ...46 Anhang DE AFA 11 15 2 EU Konformitätserklärung ...
Page 48: ...47 Anhang AFA 11 DE 15 3 Leistungserklärung ...
Page 49: ...48 Anhang DE AFA 11 ...
Page 62: ...11 Product description AFA 11 EN 4 2 Dimensions 60 mm 65 mm 100 mm 188 mm 166 mm ...
Page 73: ...2 3 1 4 5 22 Mounting EN AFA 11 2 Close the control unit ...
Page 101: ...11 Description du produit AFA 11 FR 4 2 Dimensions 60 mm 65 mm 100 mm 188 mm 166 mm ...
Page 112: ...2 3 1 4 5 22 Montage FR AFA 11 2 Fermez l unité de com mande ...
Page 141: ...11 Descripción del producto AFA 11 ES 4 2 Dimensiones 60 mm 65 mm 100 mm 188 mm 166 mm ...
Page 152: ...2 3 1 4 5 22 Montaje ES AFA 11 2 Cierra la unidad de con trol ...
Page 181: ...11 Descrizione del prodotto AFA 11 IT 4 2 Dimensioni 60 mm 65 mm 100 mm 188 mm 166 mm ...
Page 192: ...2 3 1 4 5 22 Montaggio IT AFA 11 2 Chiudere lʼunità di segnale ...