– German –
Maintenance
ÖWWG 3
27
8.2
Maintenance activities
Replacing the mains fuse F1
Mains voltage is interrupted and cannot be switched on.
1. Open the control unit, see chapter 6.2, page 17.
2. Remove the transparent cover from the mains fuse F1.
3. Replace the mains fuse F1, see table 1, page 14.
4. Snap the transparent cover onto the mains fuse F1.
5. Connect the flat cable to the connector.
6. Close the control unit, see chapter 6.2, page 17.
7. Switch on the mains voltage.
Replacing the probe fuse F2
Mains voltage is interrupted and cannot be switched on.
1. Open the control unit, see chapter 6.2, page 17.
2. Pull the probe fuse F2 from the base.
3. Plug a new probe fuse F2 into the base, see table 1, page 14.
4. Connect the flat cable to the connector.
5. Close the control unit.
6. Switch on the mains voltage.
Summary of Contents for OWWG 3
Page 32: ... Deutsch Anhang ÖWWG 3 31 16 Anhang 16 1 EU Konformitätserklärung ...
Page 33: ...Anhang Deutsch 32 ÖWWG 3 16 2 Zulassungsunterlagen ...
Page 34: ... Deutsch Anhang ÖWWG 3 33 ...
Page 35: ...Anhang Deutsch 34 ÖWWG 3 ...
Page 36: ... Deutsch Anhang ÖWWG 3 35 ...
Page 37: ...Anhang Deutsch 36 ÖWWG 3 ...
Page 38: ... Deutsch Anhang ÖWWG 3 37 ...
Page 39: ...Anhang Deutsch 38 ÖWWG 3 ...
Page 70: ... German Appendix ÖWWG 3 31 16 Appendix 16 1 EU Declaration of Conformity ...
Page 101: ... Français Annexe ÖWWG 3 31 16 Annexe 16 1 Déclaration de conformité UE ...
Page 135: ...Aneks niemiecki 34 ÖWWG 3 16 Aneks 16 1 Deklaracja zgodności UE ...