
7
3.2.4 Backup First
Priority: Battery > Load > Grid
This mode applies to situation with frequent power outages. When the public grid is off, enough
energy can be supplied to the local load by the batteries.
Battery will be charged first, and discharge energy for the local load when the grid is off. It would
be charged automatically.
3.2.5 Emergency Charging
When the voltage or SOC (state of charge) of the battery is below the safe value, battery will be
charged in priority until to the safe value.
The energy of the battery will be taken from the public grid and PV system. When the public grid
is off, the battery can only be supplied by PV system.
Summary of Contents for AF3.6K-DH
Page 14: ...13 4 2 Mounting ...
Page 17: ...16 Lithium ...
Page 19: ...18 ...
Page 22: ...21 Pin BAT NCT CAN 1 TEP T 2 TEP G 3 CAN H 4 CAN L ...
Page 27: ...26 EPS Connection Generator Connection ...
Page 49: ...48 8 Specifications Hybrid Inverter ...
Page 50: ...49 ...
Page 51: ...50 ...
Page 52: ...Building 7 No 333 Wanfang Rd Minhang District Shanghai China 201112 Version HH1004 01 ...