36
,
MENU
Protection Param
Protection Param
▲
/
▼
Chose
* * * *
V.max: xx V
V.min: xx V
F.max: xx Hz
F.min: xx Hz
F.maxT: xx S
V.minT: xx S
V.maxT: xx S
EarthChk: ON
5.3.13 Communication Parameters
Step1: “ ” Entry Menu,
Step2: “
▲
/
▼
” Up/Down Chose
Communication Param
, “ ” Confrim,
Step3: “
▲
/
▼
” Up/Down, if chose
Wifi
, “ ” Confirm,
Step4: “
▲
/
▼
” Up/Down Chose
Wifi Addr
(defualt value
“1”
), “ ” Confirm,
Step5: “
▲
/
▼
” Up/Down Chose
Wifi Prot
(Wifi protocol:
“Modbus / SunSpec”
), “ ” Confirm,
Step6: “
▲
/
▼
” Up/Down, if chose
parallel
(Multi-inverter parallel working), “ ” Confirm,
Step7: Under
P Addr
, “
▲
/
▼
” Up/Down chose inverter number of parallel working , “
”
Confirm,
Step8: “
▲
/
▼
” Up/Down chose
P Baud
, “ ” Confirm,
Step9: “
” Return.
MENU
Com Param
Com Param
Wifi Prot
:
Modbus
Wifi Prot
:
Modbus
SunSpec
Com Param
PV Mode
▲
/
▼
Chose
▲
/
▼
Chose
6. Power ON/OFF
Please check the following requirements before testing:
Installation location is suitable according to Chapter 4.1.3.
All electrical wires are connected tightly, including PV modules, battery and AC side(Such
as the grid side, EPS side, Gen side).
Earth line and Smart meter/CT line are connected.
AF-DF hybrid inverters should be set according to the required local grid standard.
More information please contact with Afore or distributors.
Summary of Contents for AF3.6K-DH
Page 14: ...13 4 2 Mounting ...
Page 17: ...16 Lithium ...
Page 19: ...18 ...
Page 22: ...21 Pin BAT NCT CAN 1 TEP T 2 TEP G 3 CAN H 4 CAN L ...
Page 27: ...26 EPS Connection Generator Connection ...
Page 49: ...48 8 Specifications Hybrid Inverter ...
Page 50: ...49 ...
Page 51: ...50 ...
Page 52: ...Building 7 No 333 Wanfang Rd Minhang District Shanghai China 201112 Version HH1004 01 ...