background image

COMPONENTS TABLE

23

MACL SERIES TABLE Confirming to BS1139-6:2014

CANTILEVER TOWER

Tower Height

Working Height

Platform Height

Weight

Counterweight

Ladder Frame
Span Frame

Walkthrough Frame

Ladder Frame Mini

Span Frame Mini

Cantilever Frame

Cantilever Horizontal Braces

Cantilever Platform

Counterweight Frame

Counterweight Platform

Counterweight Horizontal

Counterweight Diagonal

Caster Wheel

Adjustable Jack

Horizontal Braces

Diagonal Braces

Stabilizer

Stabilizer

Stabilizer

Stabilizer

Platform Trapdoor

Platform Fixed

Toe Board

7.3
8.3

6.3

3
2

1

1

1

2

4

4

6.3
7.3

5.3

3
2

1

0

0

2

4

4

246/271

220/260

266/291

230/270 240/280

8.3
9.3

7.3

4
3

1

0

0

2

4

4

296/325

5.3

3.3

198/219

200/240

2
1

1

0

0

2

4

4

4.3

4.3

2.3

169/177

190/230

3.3

6.3

4.3

2
1

1

1

1

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

14

12

0

4

0

3

14

10

4

0

0

3

18

14

0

0

4

0

4

10

8

4

0

0

2

1

1

1

1

1

1

1

1

10

6

0

0

0

2

1

1

0
1

1

1

1

2

4

4

2

2

1

2

2

2

6

4

0

0

0

0

4

4

0

0

1

1

1

4

4

216/237

210/250

5.3

Specs

in Mtrs

in Mtrs

in Kgs

in Kgs

2.0 Mtrs
2.0 Mtrs

1.4 Mtrs

1.4 Mtrs

1.4 Mtrs

1.4 Mtrs

1.4 Mtrs

2.2/2.7 Mtrs

8  Inches

0.5 Mtrs

2.0/2.5 Mtrs

2.2/2.7 Mtrs

3.0 Mtrs

2.0 Mtrs

4.5 Mtrs

6.0 Mtrs

2.0 Mtrs

2.0 Mtrs

Set

1.4 Mtrs

2.0 Mtrs

1.0 Mtr

1.0 Mtr

in Mtrs

Code

FL20135

FS20135

CFW20135

FL10135

FS10135

FC10140

FC10135

CPF140

CBH140

CBH140

JA500

BH200/250

BD200/250

ST300

ST200

ST450

ST600

PT200/250

PF200/250

BT200/250

CPF140

BD200/250

CW200

Components

620

820

420

320

520

720

MACL

Summary of Contents for MACL 320

Page 1: ...Assembly Manual Cantilever Towers MACL Series BS1139 6 2014 No CE 21 22 046...

Page 2: ...anufactured in our ISO 9001 accredited facility This user guide provides you with step by step instructions to ensure your system is assembled easily and safely using the 3T Through the Trapdoor metho...

Page 3: ...ve been designed in accordance with BS1139 6 2014 The Affix MACL Series Mobile Tower are versatile and user friendly aerial solution for all access needs It gives a work platform for use by a maximum...

Page 4: ...g electric cables No personnel or material to be on the platform whilst the tower is being moved Damaged components or components from other tower systems must never be used Stabilizers should always...

Page 5: ...oderate breeze raises dust Gale force cannot even walk Raises loose papers leaves and small twigs move Strong breeze tree branches bend unable to use umbrella 3 4 5 6 Description Air Speed Action to b...

Page 6: ...heck the locking triggers in the bracing hooks such that they are working properly Lock the castor by moving the brake lever fully down Sort the braces into horizontal and diagonal braces the diagonal...

Page 7: ...ring this step Insert the castor wheels with the jack pipe inside the bottom of the tubes of the 1st level 2 rungs Ladder Frame and Span frame DO NOT USE Hammer DO NOT USE Hammer Hook both the bottom...

Page 8: ...on Page 18 Step 3 1 Step 3 1 Step 3 2 Step 3 2 One person should hold the frame in upright position during this step Step 4 1 Step 4 1 Hook the Diagonal Brace to the 1st Rung of the 1st level 2 rungs...

Page 9: ...level 4 rungs Span Frame at one end and the other end should be hooked to the 1st Rung of the 2nd level 4 rungs Ladder Frame on the other side Step 5 2 Step 5 2 Hook the 2nd Diagonal Brace to the 1st...

Page 10: ...er pair of Horizontal Braces to the 4th Rung of both the 2nd level frames Using the 3T method standing on the ladder and leaning back against the edge of the trapdoor aperture fit the horizontal brace...

Page 11: ...Diagonal Brace to the 3rd Rung of the 2nd level 4 rungs Span Frame at one end and the other end should be hooked to the 1st Rung of the 3rd level 4 rungs Ladder Frame on the other side Step 10 2 Step...

Page 12: ...of the 3rd level 4 rungs Walk through Frame at one end and the other end should be hooked to the 3rd Rung of the 3rd level 4 rungs Ladder Frame on the other side Step 12 1 Step 12 1 Hook the working...

Page 13: ...tal Braces to the 4th Rung of both the frames of 3rd level on both the sides Step 14 1 Step 14 1 Clamp the 4 plastic toe board holders on all the 4 corners of the working platform level around the wor...

Page 14: ...s with the jack pipe inside the bottom of the tubes of the 2 rungs Counterweight Span Frame which is actually the standard 1 Mtr Span frame DO NOT USE Hammer Hook both the Counterweight Platforms side...

Page 15: ...e 2nd Rung of the 2 rungs Counterweight Frame and the other end to the 2nd Rung of the 2nd level 4 rungs Ladder Frame of the main tower 14 ASSEMBLY Step 18 Step 17 Hook the 2 Horizontal braces to the...

Page 16: ...amp the 2 Cantilever frames flushing the top of the frames with the top spigots of the main tower Place the Steel Ballast Counterweight as per the Components Table on Page 23 Step 19 ASSEMBLY 15 Step...

Page 17: ...MBLY Step 21 Step 22 Hook both the Cantilever Platforms side by side to the 1st Rung of the 5 rungs Cantilever frames Hook the 2 Horizontal braces to the 4th and the 5th Rung of the 5 rungs Cantilever...

Page 18: ...l the 4 corners of the cantilever working platform level around the cantilever working platform For more details refer to Toe board Assembly Details on Page 18 Step 23 2 Step 23 2 Insert the wooden to...

Page 19: ...ert the Side Toeboard and the End Toeboard in the respective toeboard slots as shown in the figure Clamping Instructions Always ensure the Spring Clips are in the lock position after inserting the upp...

Page 20: ...ame BD200 250 BH200 250 Diagonal Brace Horizontal Brace PF200 250 Fixed Platform PT200 250 Trapdoor Platform ST200 300 450 600 Stabilizer BT200 250 ToeBoard Set FL10135 Ladder Frame FL20135 Ladder Fra...

Page 21: ...20 COMPONENTS AFC BD BH AFC FC130 CFW20135 AFC BW AFC PF...

Page 22: ...Fig 01 Fig 01 Position the stabilizers so that the footpads are approximately equidistant from each other Adjust the stabilizers and reposition the clamps as required to make firm contact with the gr...

Page 23: ...ositioned prepare the tower for use Check that the tower is vertical Reapply the castor brakes Check and adjust as necessary to ensure all castors and stabilizers are in firm contact with the ground C...

Page 24: ...3 7 3 4 3 1 0 0 2 4 4 296 325 5 3 3 3 198 219 200 240 2 1 1 0 0 2 4 4 4 3 4 3 2 3 169 177 190 230 3 3 6 3 4 3 2 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 14 12 0 4 0 3 14...

Page 25: ...24 BS1139 6 2014 Certification by TUV India...

Page 26: ...ps www facebook com affixscaffoldin https www linkedin com company affix scaffolding llc https www linkedin com company affix scaffolding llc Website SCAN ME PO Box No 201633 Doha Qatar Tel 974 4416 1...

Reviews: