46
–50
Mounting Instructions EN
◼
SE-Power FS
◼
01.06.2022
◼
V4.4
7.6
Checking operability
1.
Make sure the controller enabling switch is turned off.
2.
Switch on the power supply of all devices. The READY-LED on the front of the device
should now be active.
If the READY-LED is not active, there is a malfunction. If the seven-segment display
indicates a number sequence, it is displaying an error message. You have to take care of the
corresponding problem. In this case please continue with
“Chapter 11.2.2 Error messages in
the Operating Instructions
”
. If the device displays nothing, follow these steps:
1. Switch off the power supply.
2. Wait 5 minutes, so the DC bus can discharge.
3. Check all connection cables.
4. Check the functionality of the 24 V power supply.
5. Switch the power supply back on.
7.7
Scaling check
▪
Proceed by hand a certain way with the axis and compare whether the travel
coincides with the display in the SE-Commander (actual position).
▪
If the servo positioning controller is controlled by a fieldbus, please check the display
of the actual position also there.
7.8
Switch on controller enable
Now the controller enable can be switched on and with this the motor is set under current.
The ENABLE-LED on the front side of the devices should be green now.
Note also the following table:
Table 19:
Dependence power stage and controller enable
Power stage enable
DIN4
Controller enable
DIN5
Motor
0
0
Not active
0
1
Not active
1
0
Not active
1
1
Active, motor is controlled
1
1
➔
0
Controlled deceleration to stop, then
motor rotate freely
1
➔
0
1
Motor is inactive immediately, drives on
uncontrolled