Chapter 2: Installation and Configuration
Unpacking the Chassis
IMPORTANT
: All electronic equipment and instrumentation is wrapped in antistatic
material and packaged with desiccant. Ensure that the antistatic material is not damaged
during unpacking.
Inspect the container of the GL4 for any evidence of shipping damage. If any damage exists, notify the
shipping carrier immediately.
Remove the packing list from the GL4 container. Make sure that all the items specified on the packing list
are contained within the package.
The documentation for the GL4 is on the included installation device. The documents include manuals,
interconnection drawings, and other documentation pertaining to the system. Save this information for
future reference. Additional information about the system is provided on the Serial and Power labels
that are placed on the GL4 chassis.
The system serial number label contains important information such as the:
l
Customer order number (please provide this number when requesting product support)
l
Drawing number
l
System part number
GL4 Hardware Manual
Chapter 2: Installation and Configuration
www.aerotech.com
23