![Aerotech ANT130LZS Series Hardware Manual Download Page 26](http://html1.mh-extra.com/html/aerotech/ant130lzs-series/ant130lzs-series_hardware-manual_2863017026.webp)
WARNING: General Hazard Warning!
l
Refer to the counterbalance setup instructions if the payload on the stage is changed
(
).
l
If the pneumatic counterbalance suddenly loses pressure, the carriage will quickly
drop. This could cause an injury or damage the equipment.
IMPORTANT
: Do not turn off air supply to system.
l
You will need make adjustments to the pneumatic pressure in this procedure.
l
Refer to
for air requirements. Make sure that the air supply meets
specifications before you continue.
ANT130LZS Payload Mounting Steps:
1. Secure the ANT130LZS to the mounting surface (refer to
).
2. Confirm that all electrical power is disconnected before you make any mechanical adjustments.
3. Make sure that the shipping bracket is removed from the stage.
4. Adjust the air supply pressure until the tabletop reaches equilibrium.
5. With the air supply on, securely reattach the shipping bracket to the stage.
6. Attach the payload to the stage.
7. Loosen but do not remove the two M3 button head screws that secure the shipping clamp to the
tabletop. This will allow the tabletop to fall a small amount.
8. Adjust the air supply pressure until the tabletop reaches equilibrium.
9. Completely remove the shipping clamp, and verify the stage is at equilibrium. Make adjustments
as necessary.
10. Reconnect the electrical power.
Figure 2-5:
Load Orientations
2.3. Attaching the Payload to the Stage
ANT130LZS Hardware Manual
26
www.aerotech.com