The multi-blade fire damper type BSK-J/EI90(G) is used to prevent fire and reduce smoke spreading 
from  one  fire  compartment  to  another  through  the  air  ductwork  system  which  may  penetrate  fire 
separating walls and floors.

According to standard EN 1336-2 they assure 

minimum

 90 minutes reliable closing.

The multi-blade fire damper can mounted in vertical (in/on rigid and light walls) or horizontal (in/on 
floor) position.

BSK-J/EI90(G)

multi-blade fire damper

 

BSK-J/EI90(G) multi-blade fire damper

BSK-J/EI90(G)/2

APPLICATION

STANDARD and NORMS

The multi-blade fire damper type BSK-J/EI90(G) is tested by PAVUS a.s. Fire testing laboratory. 

Production of the fire damper is according to EN 15650 standard: 

Tests of the fire damper is according to EN 1366-2 standard:

Determination of the fire resistance performance criteria is 
according to EN 13501-3 standard: 

Fire resistance tests for service installations.

Part 2: Fire dampers

Ventilation for buildings: 

Fire dampers.

Fire classification of construction products and building elements. 

Part 3: Classification using data from fire resistance tests on products and 
elements used in building service installations: 
fire resisting ducts and fire dampers.

Ventilation for buildings. Air terminal devices.

 

Aerodynamic testing of damper and valves 
 

Determination of the leakage of the fire damper is according to 1751 standard:

And all locally relevant regulations must be observed.

Fire resistance performance

  

    EI 90 (v  h   i

o) S

e

o

   EI 120 (v  h   i

o) S*

e

o

 EN 1366-2

EN 15650

Certificates Of Constancy Of Performance

    

1391-CPR-2017/0086

Declaration of Performance

DoP/BSK-J/001-v2/2017

 

Casing leakage

 

class B

Valve leakage

class 2

EN 1751

* some mounting options

Summary of Contents for BSK-J/EI90

Page 1: ...innovative air ow solutions re protection re damper BSK J EI90 G multi blade...

Page 2: ...6 2 standard Determination of the re resistance performance criteria is according to EN 13501 3 standard Fire resistance tests for service installations Part 2 Fire dampers Ventilation for buildings F...

Page 3: ...iptions of standard EN 15650 Performance criteria Compliance It keeps continuously its separating function without exceeding the temperature on the protected side a with more than 140 C the initial av...

Page 4: ...l e w a l l e d overlapping damper blades with steel bracing are placed with 150 mm step The louvers have the same movement direction The louvers are embedded in a heat resistant bush that is extruded...

Page 5: ...40 4 45 6 50 9 56 1 61 4 66 6 71 9 77 1 98 4 109 0 119 5 130 0 140 5 900 40 6 46 6 52 6 58 6 64 5 70 5 76 5 82 5 88 5 109 8 125 9 134 8 145 3 155 5 1050 47 6 54 4 61 1 67 9 74 6 81 3 88 0 94 8 101 5 1...

Page 6: ...tor The BSK J EI90 multi blade fire dampers are installed on the protected space in wall ceiling or air duct When the ventilation system is working the dampers are opened default In case of fire the d...

Page 7: ...III IP 54 o 60 mp 90 20 mp 9 Nm 7 Nm o o 30 C 55 C o o 40 C 55 C BFN 24 T BFN 230 T AC 230 V 50 60 Hz 5 W 2 1 W 10 VA Imax 4 A 5 ms II o 60 mp 90 20 mp 9 Nm 7 Nm BSK J EI90 G multi blade fire damper B...

Page 8: ...e BSK J EI90 multi blade fire damper with the connection frame is 200 mm The connection to the ductwork system is done with a 30 mm MEZ flange that has 4 pcs 9 1x19 mm oval holes on the corners In the...

Page 9: ...ling the easy move must be controlled The damper must be installed with closed blades The contact with splashing or running water must be avoided therefore it must be protected ex outdoors must be fit...

Page 10: ...50 1 317 1 239 1 162 1 093 1 027 0 965 0 906 0 852 0 827 0 767 0 706 0 667 0 628 0 589 900 1 261 1 192 1 106 1 027 0 953 0 884 0 820 0 773 0 706 0 656 0 621 0 588 0 555 0 522 1050 1 273 1 143 1 091 0...

Page 11: ...CRETE BSK J EI90 G multi blade fire damper BSK J EI90 G multi blade fire damper fire damper plaster mortar or concrete air duct system Fire protection panel coated Coated fire protection panel Materia...

Page 12: ...29 50 50 50 129 435 B multi blade fire damper BSK J EI90 G multi blade fire damper PLASTER MORTAR and CONCRETE fire damper plaster mortar or concrete air duct system Fire protection panel coated Coate...

Page 13: ...ade fire damper vertical position horizontal axis vertical position vertical axis Fire protection wall max dimension 1650x2050 or 2050x1650 mm Materials can be used 1 HILTI fire protection panel CFS C...

Page 14: ...ock EI90 4 mineral wool panel with 140 kg m3 density Rockwool Steprock or equivalent materials multi blade fire damper air duct system 3 stone wool 4 mineral wool 1 fire board 3 1 15 mm thick fire pro...

Page 15: ...multi blade fire damper BSK J EI90 G multi blade fire damper INSTALLATION IN FLOOR PLASTER MORTAR and CONCRETE Coated fire protection panel Materials can be used 1 HILTI fire protection panel CFS CTB...

Page 16: ...ti blade fire damper fire board air duct system floor INSTALLATION IN FLOOR PLASTER MORTAR and CONCRETE Coated fire protection panel Materials can be used 1 HILTI fire protection panel CFS CTB 1S 140...

Page 17: ...RE PROTECTION PANEL horizontal position Fire protection wall max dimension 1650x2050 or 2050x1650 mm Materials can be used 1 HILTI fire protection panel CFS CTB 1S 140 50 2 HILTI fire protection coati...

Page 18: ...ASTER MORTAR and CONCRETE PLASTER MORTAR and CONCRETE 1 mineral stone wool fire panel coated on one side with aluminium foil for air duct isolation with fire resistance 3 class EI90 2x60 mm thickness...

Page 19: ...air duct isolation with fire resistance 3 class EI90 2x60 mm thickness and 300 kg m density Conlit Ductrock EI90 4 mineral wool panel with 140 kg m3 density Rockwool Steprock or equivalent materials v...

Page 20: ...6 22 44 M10 58 35 70 M12 84 3 52 104 M14 115 70 140 M16 157 96 192 M18 192 117 234 M20 245 150 300 Weight kg 1 pc 2 pcs multi blade fire damper BSK J EI90 G multi blade fire damper INSTALLATION ON THE...

Page 21: ...months In case of an existing monitoring system this can be done from one place trough the servomotors and their limit switch sensors The BSK J EI90 multi blade dampers must be transported laid on or...

Reviews: