aero pure AP100-RVL Installation Manual Download Page 11

3

PANEL DE 

CABLEADO

Motor

N

GRD

BLK

BLK

W HT

BLK

W HT

COM

L

WHT

T

H

W HT

BLU

BRN

UNIDAD

NEGRO (BLK)

SENSOR

  LUZ

CAJA DE INTERRUPTORES

VENTILADOR

ENTRADA DE LÍNEA DE 120 VCA

CONEXIÓN A TIERRA (GRD)

MARRÓN (BRN)

BLANCO (WHT)

AZUL(BLU)

RECEPTÁCULO 

DEL VENTILADOR

RECEPTÁCULO

 DE LA LUZ

RECEPTÁCULO DEL 

SENSOR DE HUMEDAD

AP80H-RVL

AP100H-RVL

AP80H-QVL

Joist

Lamp base

Wing nut

Fluo rescent lamp

Ceiling

After finishing t he ceili ng job, fill gap bet ween flange and ceiling wit h
caulk or ot her sealant t o prevent air leakage.

Remove the screws

Blower system

Lamp base

Remove the screws

Remove the screws

Hanger
bar

6 1/2 in.

(165mm

)

>1/8 in.

(3.2mm)

 Barra de 
  fijación

Techo

Viga

Después de terminar el trabajo del techo, rellene el espacio entre la brida y 
el techo con masilla u otro sellador para evitar fugas de aire.

>3,2 mm

(1/8 pulg.)

6 1/2

 pu

lgad

as

(165mm)

Tuerca tipo 
mariposa

Base de la
 lámpara

Retire los tornillos

Base de la lámpara

Sistema de soplado

Retire los tornillos

Retire los tornillos

PANEL DE 

CABLEADO

UNIDAD

NEGRO(BLK)

  LUZ

CAJA DE INTERRUPTORES

VENTILADOR

FUENTE DE ALIMENTACIÓN 

120 VCA

CONEXIÓN A TIERRA(GRD)

AZUL(BLU)

BLANCO(WHT)

RECEPTÁCULO 

DEL VENTILADOR

RECEPTÁCULO 

DE LA LUZ

1.

 Se debe hacer un orificio redondo en el techo de 165 mm (6 1/2 pulgadas) 

de diámetro. Selle cualquier hueco entre el orificio de la pared de yeso y el 
ventilador con sellador.

2.

 Instale la lámpara fluorescente compacta o LED. Lámpara no incluida.

3.

 Se puede ajustar el alojamiento de la lámpara  hacia arriba o hacia abajo 

para acomodar diferentes lámparas. La unidad es apta para el uso de un 
adaptador y lámpara GU24.

1.

 Retire el anillo embellecedor separando los muelles.

2.

 Retire los tornillos como se muestra a la derecha.

3.

 Retire la base de la lámpara.

4. 

Tire del sistema de conductos para que pueda ver el sistema de soplado.

5. 

Retire los tornillos como se muestra a la derecha.

6.

 Retire el sistema de soplado de la carcasa.

7.

 Reemplace las piezas rotas.

AP80-RVL   AP100-RVL   AP80-QVL

CONEXIÓN DEL CABLEADO ELÉCTRICO

Lleve el cableado de 120 V de CA del hogar al ventilador. Utilice únicamente conectores aprobados por UL (no incluidos) para conectar 
el cableado del hogar a la placa de cableado. Consulte el diagrama de cableado y conecte los cables como se muestra.

INTERRUPTOR 
DE LA LUZ

INTERRUPTOR 
DEL VENTILADOR

LÍNEA DE 
ENTRADA

CAJA DE INTERRUPTORES

UNIDAD

VENTI

LUZ

INTERRUPTOR 
DEL VENTILADOR

INTERRUPTOR 
DEL SENSOR

INTERRUPTOR 
DE LA LUZ

LÍNEA DE 
ENTRADA

CAJA DE INTERRUPTORES

UNIDAD

VENTI

LUZ

SENSOR DE HUMEDAD

FINISHCEILING WORK

Lámpara fluorescente

SUSTITUCIÓN DE COMPONENTES

SUSTITUCIÓN DE COMPONENTES

Summary of Contents for AP100-RVL

Page 1: ...LLOWING 1 Use this unit only in the manner intended by the manufacturer If you have questions contact the manufacturer at the address or telephone number listed in the warranty 2 Before servicing or cleaning unit switch power off at service panel and lock the service disconnecting means to prevent power from being switching on accidentally If the service disconnecting means cannot be locked secure...

Page 2: ...bars may be used on all types of framing I joist standard joist and truss construction Slide hanger bars onto housing and adjust as needed to fit between framing 1b Extend the hanger bars to the width of the framing Position the fan with the hanger bar tabs aligned with the bottom edge of the framing holding the ventilator in place Secure hanger bars to framing using one screw on each end of hange...

Page 3: ...n 3 2mm Fluorescent lamp Hanger bar Ceiling Joist After finishing the ceiling job fill gap between flange and ceiling with caulk or other sealant to prevent air leakage 1 8 in 3 2mm 6 1 2 in 1 65 m m Wing nut Lamp base Remove the screws Lamp base Blower system Remove the screws Remove the screws WIRE PANEL UNIT BLACK BLK LIGHT SWITCH BOX FAN POWER SUPPLY 120V AC GROUND GRD BLUE BLU WHITE WHT FAN R...

Page 4: ...usehold use for a period of 72 months THIS WARRANTY DOES NOT COVER Damages from improper installation Damages from shipping Damages from misuse abuse accident alteration lack of proper care and maintenance Damages from service by persons other than a licensed electrician Does not cover any labor or transportation charges related to the repair of this product This warranty does not extend to fluore...

Page 5: ...www aeropurefans com 5 AP100H RVL AP80 RVL AP80H RVL AP80H QVL AP80 QVL AP100 RVL ...

Page 6: ...A 6 ...

Page 7: ...MIDITÉ BRUN BRN AP80H RVL AP80H QVL Joist Lamp base Wing nut Fluorescent lamp Ceiling After finishing the ceiling job fill gap between flange and ceiling with caulk or other sealant to prevent air leakage Remove the screws Blower system Lamp base Remove the screws Remove the screws Hanger bar 6 1 2 in 165m m 1 8 in 3 2mm 1 8 in 3 2mm 6 1 2 in 1 65 m m AP80 RVL AP100 RVL AP80 QVL ...

Page 8: ...ews Wire Panel 1a 2 3 4 5 6 7 9 10 1 1 2 1 1 4 1 1 1 1 1 8 1 11 12 13 1 3 2 5 4 6 7 8 9 10 11 6 12 13 Du détecteur d humidité AP80H RVL AP80H QVL 8 1a 1b AP80 RVL AP80H RVL AP100 RVL AP100 RVL 1b 1 AP80 QVL AP80H QVL ...

Page 9: ...DESCARGA ELÉCTRICA O LESIONES A PERSONAS LEA LO SIGUIENTE 1 Utilice esta unidad únicamente de la manera prevista por el fabricante Si tiene preguntas póngase en contacto con el fabricante a la dirección o al número de teléfono que figuran en la garantía 2 Antes de realizar labores de mantenimiento o limpiar la unidad apáguela desde el panel de servicio y bloquee el sistema de desconexión de servic...

Page 10: ...ción corta 30 90 cm de conducto flexible aislado garantizará un funcionamiento silencioso PLANIFICACIÓN DE LA INSTALACIÓN No lo utilice en un área de cocina Dos formas de conectar los conductos a una unidad de fábrica CUBIERTA DE TECHO con compuerta incorporada CONDUCTO REDONDO compra por separado CARCASA DEL VENTILADOR CODO S REDONDO S Selle las uniones de los conductos con cinta Mantenga los con...

Page 11: ... un orificio redondo en el techo de 165 mm 6 1 2 pulgadas de diámetro Selle cualquier hueco entre el orificio de la pared de yeso y el ventilador con sellador 2 Instale la lámpara fluorescente compacta o LED Lámpara no incluida 3 Se puede ajustar el alojamiento de la lámpara hacia arriba o hacia abajo para acomodar diferentes lámparas La unidad es apta para el uso de un adaptador y lámpara GU24 1 ...

Page 12: ...sulte defectuosa en el uso doméstico normal por un período de 72 meses ESTA GARANTÍA NO CUBRE Daños por instalación incorrecta Daños por el transporte Daños por mal uso abuso accidente alteración falta de cuidado y mantenimiento adecuados Daños causados por la asistencia de personas que no sean electricistas autorizados No cubre los gastos de mano de obra o transporte relacionados con la reparació...

Reviews: