44
MINIMUM OPERATIONAL SPACES
HANDLING
INSTALLATION OF THE UNIT
All the required operational spaces must be checked before starting
installation:
• renewal and expulsion air ducting position;
• passage of cables for power supply;
• proper maintenance and cleaning operations;
In particular:
• a space of at least 200 mm must be available at the condensation
drain to implement the siphon (more detailed instructions are found
on the label).
• there must be a space of at least 400 mm near the water coil
collectors to install the valve.
• There must be a space of at least 1000 mm for routine maintenance
(eye checks, replacing and cleaning filters).
PACKAGING
The TA series air conditioning units are generally supplied on pallets and
packed in cardboard boxes.
STORAGE ON SITE
The TA series units must be stored indoors.
TRANSPORT
Transport must be performed taking the following precautions:
• suitable blocking onto the lorry deck;
• load protection with adequate protection;
VERIFICATIONS UPON RECEPTION
On receipt of the unit, a visual control must be carried out to check that no
damage has occurred during transport. If damage has occurred it must be
highlighted on the accompanying transport document.
Follow the indications below to install the equipment correctly.
The completion of all operations, according to specific requirements, is left
to the experience of the installer.
The unit is supplied with support brackets to mount it on the wall or
ceiling.
The brackets can be mounted with the bends facing inwards or outwards.
For different types of assemblies, the following instructions must be
modified depending on specific worksite requirements.
It is always advised to fix the brackets to the ceiling first of all (with expan-
sion plugs or threaded tie rods) and then to fix the units to the brackets.
When performing vertical installation, the screws fastening the brackets
will rest on the shorter part of the slots.
To fasten the unit to the wall, proceed as follows:
- mark the four holes for the expansion plugs;
- prepare the fixing system (expansion plugs or tie rods);
- fix the brackets to the wall or to the ceiling using nuts, washers
and back nuts;
- screw on the 4 side screws to the unit to the brackets;
- for horizontal installation, before tightening the screws, nuts and
back nuts make sure that condensation drains properly;
It is advised to provide a slight slope towards the drain to favour
runoff.
Summary of Contents for TA 09
Page 2: ......
Page 51: ...51 WIRING DIAGRAMS TA09 E WMT05 PE L N 230V 50Hz IG MAX MED MIN ...
Page 52: ...52 TA09 E WMT06 PE L N 230V 50Hz IG VF VC MAX MED MIN ...
Page 53: ...53 TA09 E WMT10 PE L N 230V 50Hz IG VF VC MAX MED MIN ...
Page 56: ...56 TA19 24 CON WMT05 E MOTORE CMC PE L N 230V 50Hz IG KA1 KA2 KA3 MAX MED MIN ...
Page 57: ...57 TA19 24 CON WMT06 E MOTORE CMC PE L N 230V 50Hz IG KA1 KA2 KA3 VC VF MAX MED MIN ...
Page 58: ...58 TA19 24 CON WMT10 E MOTORE CMC PE L N 230V 50Hz IG KA1 KA2 KA3 VC VF MAX MED MIN ...
Page 59: ...59 TA33 50 CON WMT05 E MOTORE CMC PE L N 230V 50Hz IG KA1 KA2 KA3 MAX MED MIN MAX MED MIN ...
Page 69: ...69 STO MAX MED MIN 82 82 38 PX mm PX mm ...
Page 70: ......
Page 71: ......