-  Install the unit at a distance enough from the exhaust wells, to ensure 

that the possible loss of gas may reach and pollute the aquifer

-  Keep all lubricants in properly marked containers do not keep 

flammable liquids near the plant 

-  Do not remove the protections from mobile elements while the unit 

is running 

-  Do not use cables with inadequate section or flying connections, not 

even for limited periods or emergencies 

-  Check the unit is properly earthed before starting it 

-   Before opening the electrical panel, disconnect the unit from the 

mains by means of the external isolator 

-  In case of units with shunt capacitors, wait 3 minutes from when 

power supply was disconnected from the unit before accessing inside 

the electrical panel 

-  If the unit is equipped with integrated inverter compressors, 

disconnect the power supply and wait at least 15 minutes before 

accessing for maintenance: the internal components remain live for 

this time, generating the risk of electrocution 

-  The safety devices must be maintained efficient and periodically 

checked as prescribed by current regulations 

-  In case a piece is disassembled, make sure it is correctly reassembled 

before restarting the unit 

-  Even with the unit off, prevent the fluid in contact with the 

heat exchangers exceed the temperature limits indicated in the 

documentation and freeze.

-  Do not send the heat exchangers fluids other than water or its 

mixtures with ethylene glycol/propylene in a maximum concentration 

of 30% 

-  The machine must only be employed for the use for which it was 

made; any other use can be dangerous and void the warranty

P

reVentiOns

-  Make sure that the protections of mobile elements are correctly in 

place before restarting the unit 

-  Fans, motors and belt drives may be in motion: always wait for them 

to stop and take appropriate precautions to prevent their activation 

before accessing them 

-  The machine and the pipes have very hot and very cold surfaces that 

lead to risk of burns

-  Before opening a machine panel, ascertain whether it is or not firmly 

connected to it by hinges 

-  Louvers of the heat exchangers, edges of the components and metal 

panels can generate cuts

 -  The installation must ensure that the temperature of the fluid 

entering the unit is maintained stable and within the provided limits; 

therefore, pay attention to the adjustment of any external thermal 

exchange and control devices (drycooler, evaporating towers, 

area valves, ...), to the adequate dimensioning of the mass of fluid 

circulating in the plant (in particular when plant areas are excluded) 

and to install systems for the recirculation of the necessary fluid flow 

rate so as to maintain the machine temperatures within the allowed 

limits (e.g. during the start-up phase). 

-  The material used for the machine protective packaging must always 

be kept out of the reach of children as it is a source of danger 

-  In units with compressors in parallel, do not disable the individual 

compressors for long periods.

-  This is an appliance not accessible to the general public.

Summary of Contents for NRB 0800

Page 1: ...BARCODE EN Installation and Maintenance Manual TRANSLATION FROM ORIGINAL 21 01 4138476_03 OUTDOOR INSTALLATION MICROCHANNEL COIL NIGHT MODE NRB H 0800 2400 60Hz...

Page 2: ......

Page 3: ...st grade materials and with cutting edge technology The quality level is being constantly monitored so AERMEC products are synonymous with Safety Quality and Reliability The data may undergo modificat...

Page 4: ...tronic Equipment WEEE please return the device using appropriate collection systems or contact the retailer where the product was purchased Please contact your local authority for further details Ille...

Page 5: ...NECTIONS 15 ELECTRIC POWER CONNECTION TO THE ELECTRICAL MAINS 16 ELECTRICAL DATA 208V 3 60HZ FAN J 17 ELECTRICAL DATA 230V 3 60HZ FAN J 17 ELECTRICAL DATA 460V 3 60HZ FAN J 17 ELECTRICAL DATA 460V 3 6...

Page 6: ...ecessary repairs The installation must comply with the requirements of EN378 3 and the local current regulations In particular indoor installation must ensure adequate ventilation and provide refriger...

Page 7: ...tures with ethylene glycol propylene in a maximum concentration of 30 The machine must only be employed for the use for which it was made any other use can be dangerous and void the warranty PreVentiO...

Page 8: ...etails of the problem to the shipping company within 48 working hours from delivery lifting Before lifting the unit place protections between the belts or ropes and chains and the framework to prevent...

Page 9: ...heck that the contact surfaces of the anti vibration supports are levelled to the base If necessary use spacers or level the base but in any case make sure that the anti vibration supports rest flat o...

Page 10: ...AA BH NRB n n in in in 0800 HA HE 3 6 97 87 156 0900 HA HE 4 8 97 87 203 1000 HA HE 4 8 97 87 203 1100 HA HE 4 8 97 87 203 1200 HA HE 4 8 97 87 203 1400 HA HE 5 10 97 87 250 1600 HA HE 6 12 97 87 297...

Page 11: ...ectric power board Unit Vers V block Fans Panel type A B C D E NRB H n n in in in in in 800 HA HE 3 6 1 39 43 39 32 118 900 HA HE 4 8 1 39 43 39 32 118 1000 HA HE 4 8 1 39 43 39 32 118 1100 HA HE 4 8...

Page 12: ...8 12 0 14 8 12 9 15 9 0 0 19 9 24 6 NRB 1100 HA HE 8995 100 48 9072 99 48 11 8 14 8 12 8 16 0 0 0 19 8 24 8 NRB 1200 HA HE 9237 99 48 9348 98 48 12 0 14 8 13 1 16 3 0 0 19 6 24 2 NRB 1400 HA HE 10538...

Page 13: ...in the highest points of the circuit and also provide discharge fittings in the lowest points to allow emptying the entire circuit To maintain the pressure in the circuits you must install an expansio...

Page 14: ...IL RISARCIMENTO DEI DANNI NE UTILIZZARE IL CONTENUTO O RENDERLO COMUNQUE NOTO A TERZI SENZA LA NOSTRA NON E PERMESSO CONSEGNARE A TERZI O RIPRODURRE QUESTO DOCUMENTO SOST DA SOST IL APPROV CONTR DISE...

Page 15: ...am fig 1 The use of an omnipolar magnet circuit breaker switch in compliance with the current Standards contact opening at least 0 12 in with suitable cut off power and differential protection on the...

Page 16: ...N TO THE ELECTRICAL MAINS 2 B F 3 31 03 2017 4 RIEPILOGOMORSETTI 5 E 1 31 03 2017 1 2 6 5 6 C D NOME FILE TIPICO SUBITI E FATTA RISERVA DI TUTTI I DIRITTI DERIVANTI DA BREVETTI O MODELLI AUTORIZZAZION...

Page 17: ...J 460V 3 60Hz fan J Units LRA MCA MOP Recommended fuse Phases Mod Comp Fan NRB Vers n n A A A n n 0800 HA HE 4 6 291 129 156 150 3 0900 HA HE 4 8 341 139 169 150 3 1000 HA HE 4 8 357 155 185 175 3 11...

Page 18: ...00 HA HE 4 14 575 254 306 250 3 2200 HA HE 5 16 600 298 350 300 3 2400 HA HE 6 16 506 348 398 350 3 575V 3 60Hz fan Units LRA MCA MOP Recommended fuse Phases Mod Comp Fan NRB Vers n n A A A n n 0800 H...

Page 19: ...VX1016 AVX1016 HE AVX1004 AVX1006 AVX1006 AVX1006 AVX1006 AVX1010 AVX1013 AVX1024 AVX1024 AVX1033 AVX1033 AVX Hydronic kit PA PB PC PD PE PF PG PH DA DB DC HA AVX1001 AVX1004 AVX1004 AVX1004 AVX1004 A...

Page 20: ...ure drop tables present in this manual Check the correct functioning of the flow meters if installed Closing the cut off valve at the output of the heat exchanger the unit control panel must show the...

Page 21: ...tivation before accessing them Isolate the unit from the mains by means of the external isolator provided for the insertion of padlocks up to 3 for blocking in open position Place a sign reading Do no...

Page 22: ...placed after draining the refrigerant gas contained in the circuit During venting protect yourself against any leakage of fluids at dan gerous temperatures and or pressures Always use appropriate equi...

Page 23: ...e machine panel where the control panel is located remaining distant and not exposed to the under pressure parts of the cooling circuit CLEANING COIL MICRO CHANNEL Keep surfaces clean battery mirco ch...

Page 24: ...particular attention to under pres sure containers In this case replace them of intervene with specific products General cleaning of the unit Bleed the hydraulic circuit and the heat exchangers the si...

Page 25: ...ctioning of the thermostatic valve Check the charge of refrigerant gas 1 Check the proper functioning of the solenoid valves MAINTENANCE LIST OF THE RECOMMENDED PERIODIC INTERVENTIONS DECOMMISSIONING...

Page 26: ......

Page 27: ......

Page 28: ...qua VR Italia Tel 39 0442 633111 Fax 39 0442 93577 marketing aermec com www aermec com Aermec reserves the right to make all modification deemed necessary for improving the product at any time with an...

Reviews: