18
CONTROLS TO PERFORM BEFORE STARTING-
UP
Before starting the unit for the first time, first check that
the float is positioned correctly.
The steps to follow are described below:
1. Grasp the handles on both sides of the condensate
drip tray and remove it in the direction of the arrow.
2. Check that the float in the condensate drip tray is
positioned correctly, as it could have moved during
transport. It must be positioned manually in the
correct position.
CORRECT POSITION
INCORRECT POSITION