
18
Wall unit mounting - Fig. 10
Assemble the frame to the motor group
(1)
.
Carry out the connection to the control ball and to the lamps (
2
)
-
Note: the connectors contain an obliged mounting direction
,
the connector for the control ball should be fixed in order that the
small dent corresponds to the housing perforation on the side of the
connection socket at the back of the control ball.
Fix the frame to the motor group using two screws
(3)
.
Sign the wall with a center line, this will aid mounting procedure
(4)
,
position the template so that the mid line printed on the template
matches with the center line previously signed, the lower side of the
template corresponds to the lower side of the hood once mounted
(5)
.
Drill two holes Ø 8mm and fix the support bracket with two wall
plugs and screws
(6)
.
Hang the hood
(7)
adjust its position
(8-9)
and from the inside of the
hood sign one point for definitive fixing
(10)
, remove the hood and
drill an hole Ø 8mm
(11)
, fit a wall plugs, hang the hood again and
fix it definitively with a screw
(12)
.
Drill two holes Ø 8mm on the upper side close to the ceilling
(13)
, fit
two wall plugs and fix the chimney support with two screws
(14)
.
In case the hood is to be used in
filter version
, mount the deflector
F
on the chimney support with four screws and fit an exhausting
pipe
(15)
to connect deflector to the outlet hole
D
of the hood.
In case the hood is to be used in exhausting version, then the
deflector must not be mounted and fit an exhausting pipe
(15)
to
connect outlet hole
D
of the hood to the outside.
Make electrical connection
(16)
, but leave the hood disconnected
from the home general electric panel.
Insert the vapour screen on the motor housing and fix it with four
screws
(17)
.
Fix the chimney first up
(18a)
to the chimney support
(18b)
, then on
the bottom
(19a)
to the upper side of the frame
(19b)
using four
screws.
Connect the hood the the home general electric panel and check if
the hood work properly.