AEC UPS IST7 10-30 kVA
User Manual
2 Overview
25
Figure1.5
Manual forklift
When lifting, pay attention to the balance and stable of the UPS.
During moving, keep the UPS vertical and do not put down or uplift suddenly.
3.3.2 Unpacking
Check if the package appearance is in good condition and if there is any damage caused by transportation. If
damaged, please inform the carrier immediately.
Transport the UPS to assigned site.
Unpack the external package, remove the foam pad and plastic bag, and take out the accessories.
Check the UPS.
Inspect the appearance of the UPS and check if there has any damage caused by transportation. If
any damage, please inform the carrier immediately.
Compare with the packing list and check if the accessories mode is complete and proper. If the
accessories lack or model wrong, please take note and contact the our company or local agency
of our company.
Dismantle the 4 fasten bolts of bottom supporting plate and UPS, and 4 fasten bolts of wooden bracket and bottom
supporting plate, and then, remove the supporting plates, as shown in Figure1.6.
Summary of Contents for IST7 20kVA
Page 1: ...User Manual AEC UPS IST7 The NEW high frequency Three Phase 10kVA 30kVA...
Page 2: ......
Page 8: ......
Page 86: ......