UNO-IPS2730 User Manual
10
2.6
Power Cable & Control Cable Installation
Connect the cables after installation of UNO-IPS2730. Below we use the example of
an UNO-3382G as a loading machine. If customers use another PC as a loading
machine, install cables according to the other machines connector pin definitions.
Summary of Contents for UNO-IPS2730
Page 1: ...User Manual UNO IPS2730 Intelligent Power System for PCs...
Page 6: ...UNO IPS2730 User Manual vi...
Page 8: ...UNO IPS2730 User Manual viii...
Page 12: ...UNO IPS2730 User Manual 4...
Page 19: ...Chapter 3 3 UNO IPS2730 Adjustment Tool...
Page 23: ...15 UNO IPS2730 User Manual Chapter 3 UNO IPS2730 Adjustment Tool...