Figure 4.9 On delay
On Delay
– it means after 2 seconds from receiving of ignition ON signal, EC controller
will send a power-on event to make system start booting process.
Figure 4.9 Low delay
Low Delay
– it means after 30 seconds delay from receiving of Battery Voltage LOW
signal, EC controller will send a shutdown event to make system start shutdown
process.
Figure 4.9 Low hard delay
Low Hard Delay
– it means after 60 seconds from Low Voltage shutdown event, EC
controller will force power cut off at the same time
Figure 4.9 Battery voltage Threshold level setting
You could set the LOW battery voltage value by changing level 0 to 65. For example, if
you’re using 12V battery, and you set level as 50, it means the LOW battery voltage
value is 10.147 + 50 x 0.0146 = 10.877 V.
Checks which source you’re connecting. DC supply or 12V or 24V battery.
Figure 4.9 check 12 or 24 battery
Check the ignition signal and see if it’s ON or OFF.
32
www.advantech.com
Summary of Contents for TREK-520
Page 1: ...User Manual TREK 520 Computer...
Page 18: ...Chapter 3 Pin Assignments This appendix explains pin assignments on the TREK 520...
Page 19: ...3 1 Front Side Connectors 3 2 Rear Side Connectors...
Page 37: ...37 www advantech com Appendix A This appendix explains the TREK 303 detailed information...
Page 39: ...TREK 303 Specification TREK 303 demo SW application program Figure 6 17 39 www advantech com...