4.3.3
Power Management Parameter settings
The parameters for power management on TREK-520 could be set by Demo program
(see the image below) or SDK/API.
Figure 4.9 power management demo utility
Figure 4.9 Off event delay
Off Event Delay
– it means after 5 seconds delay from receiving of ignition OFF signal,
EC controller will send a shutdown event to make system start shutdown process
Figure 4.9 Hard Off delay
Hard off Delay
– it means after 30 seconds from shutdown event, EC controller will
force power cut off at the same time.
31
www.advantech.com
Summary of Contents for TREK-520
Page 1: ...User Manual TREK 520 Computer...
Page 18: ...Chapter 3 Pin Assignments This appendix explains pin assignments on the TREK 520...
Page 19: ...3 1 Front Side Connectors 3 2 Rear Side Connectors...
Page 37: ...37 www advantech com Appendix A This appendix explains the TREK 303 detailed information...
Page 39: ...TREK 303 Specification TREK 303 demo SW application program Figure 6 17 39 www advantech com...