IPC-510 User Manual
/ 用户手册
6
Note!
Use caution when installing or operating the components with the chas
-
sis open. Be sure to turn off the power, unplug the power cord, and
ground yourself by touching the metal chassis before you handle any
components inside the machine.
注 !
机箱打开时,请小心安装或操作机箱内部组件。请务必关闭机箱电源并
断开电源线。接触机箱内部组件之前,请先触摸金属机箱接地。
註 !
機箱打開時,請小心安裝或操作機箱內部元件。請務必關閉機箱電源並
拔除電源線。接觸機箱內部元件之前,請先觸摸金屬機箱接地。
Note!
Reverse installation is not permitted. Otherwise there will be a hazard at
the bottom opening. The key lock area is a skill personnel operation
area.
注 !
以下系统安装,请联系研华专业技术团队。禁止反向安装,否则会有底
部开孔的危险。钥匙锁定区域为技术人员操作区域。
註 !
以下系統安裝,請聯繫研華專業技術團隊。禁止反向安裝,否則會有底
部開孔的危險。鑰匙鎖定區域為技術人員操作區域。
Summary of Contents for IPC-510 Series
Page 1: ...User Manual IPC 510 Series 4U Rackmount Industrial Chassis for General Applications 4U 4U...
Page 10: ...IPC 510 User Manual x...
Page 12: ...IPC 510 User Manual xii 1 CPU 2 3 RMA Return Mate rial Authorization 4 5 RMA...
Page 14: ...IPC 510 User Manual xiv...
Page 17: ...Chapter 1 1 General Information...
Page 20: ...IPC 510 User Manual 4 1 5 Dimension Diagram Figure 1 1 Dimension diagram Unit mm inch...
Page 21: ...Chapter 2 2 System Setup...
Page 25: ...9 IPC 510 User Manual Chapter 2 System Setup Figure 2 2 Installing the Backplane...
Page 29: ...Chapter 3 3 Operation...
Page 33: ...Appendix A A Exploded Diagrams Parts List...
Page 34: ...IPC 510 User Manual 18 A 1 Exploded Diagram Figure A 1 Exploded diagram...
Page 35: ...19 IPC 510 User Manual Appendix A Exploded Diagrams Parts List...