13
EKI-7428 Series User Manual
5.
Make sure the module is seated correctly before sliding the module into the slot.
A click sounds when it is locked in place.
Figure 2.4 Installing an SFP Transceiver
6.
Remove the protective plug from the SFP transceiver.
7.
Insert the fiber cable into the transceiver. The connector snaps into place and
locks.
Figure 2.5 Attaching a Fiber Optic Cable to a Transceiver
8.
Repeat the previous procedures to install any additional SFP transceivers in the
switch.
The fiber port is now setup.
Note!
If you are attaching fiber optic cables to the transceiver, continue with
the following step. Otherwise, repeat the previous steps to install the
remaining SFP transceivers in the device.
Note!
Do not remove the dust plug from the transceiver if you are not installing
the fiber optic cable at this time. The dust plug protects hardware from
dust contamination.
Handle
Summary of Contents for EKI-7428 Series
Page 1: ...User Manual EKI 7428 Series 24GE 4G Combo 24GE PoE 4G Combo Port L2 Managed Switch ...
Page 14: ...Chapter 1 1Product Overview ...
Page 20: ...Chapter 2 2Switch Installation ...
Page 35: ...Chapter 3 3Configuration Utility ...
Page 41: ...Chapter 4 4Managing Switch ...
Page 138: ...125 EKI 7428 Series User Manual 4 12 1 Modbus TCP Mapping Table ...
Page 156: ...Chapter 5 5Troubleshooting ...
Page 158: ...145 EKI 7428 Series User Manual ...