EKI-136x-MB-BE Series User Manual
12
See the following figure for an illustration of a completed DIN installation
procedure.
Figure 2.7 Correctly Installed DIN Rail Kit
3.
Grasp the bottom of the gateway and slightly rotate it upwards. If there is
resistance, the gateway is correctly installed. Otherwise, re-attempt the
installation process from the beginning.
2.2.1.2
Removing the DIN-Rail Mounting Kit
1.
Ensure that power is removed from the gateway, and disconnect all cables and
connectors from the front panel of the gateway.
2.
Push down on the top of the DIN rail clip release tab with your finger. As the clip
releases, lift the bottom of the gateway, as shown in the following illustration.
\
Figure 2.8 Removing the DIN-Rail
Summary of Contents for EKI-136-MB-BE Series
Page 1: ...User Manual EKI 136x MB BE Series 1 2 port RS 232 422 485 to 802 11a b g n WLAN Modbus Gateway...
Page 11: ...Chapter 1 1Introduction...
Page 16: ...Chapter 2 2Getting Started...
Page 32: ...Chapter 3 3Utility Configuration...
Page 46: ...Chapter 4 4Web Interface...
Page 71: ...Chapter 5 5Telnet Serial Console Configuration...