
5708577-A
5-1
Chapter
AMN PS-2A
Chapter
5
5
Installation, Setup, and
Operation
INSTALLING
The following sections describe how to install the AMN PS-2A matching network
controller.
Unpacking
Unpack and inspect your controller carefully. Check for obvious physical damage. If
no damage is apparent, proceed with the unit connections. If you do see signs of
shipping damage, contact Advanced Energy Industries, Inc., and the carrier
immediately. Save the shipping container for submitting necessary claims to the
carrier.
Grounding
Equipment earth ground provided via IEC 320 ac input power connector.
Spacing Requirements
The following dimensional drawing illustrates the spacing requirements of the AMN
PS-2A controller.
Summary of Contents for AMN PS-2A
Page 3: ......
Page 4: ...User Manual AMN PS 2A Automatic Matching Network Power Supply Controller 5708577 A...
Page 7: ...vi 5708577 A Advanced Energy...
Page 11: ...x 5708577 A Advanced Energy...
Page 13: ...xii 5708577 A Advanced Energy...
Page 19: ...1 6 5708577 A Advanced Energy...
Page 23: ...2 4 5708577 A Advanced Energy...
Page 37: ...4 10 5708577 A Advanced Energy...
Page 39: ...5 2 5708577 A Advanced Energy DIMENSIONAL DRAWING Figure 5 1 Dimensions...
Page 43: ...5 6 5708577 A Advanced Energy...