
Getting Started
17
DLAP-211-JNX / DLAP-211-JT2 / DLAP-211-Nano Series
2
Getting Started
2.1
Unpacking Checklist
Before unpacking, check the shipping carton for any damage. If
the shipping carton and/or contents are damaged, inform your
dealer immediately. Retain the shipping carton and packing
materials for inspection. Obtain authorization from your dealer
before returning any product to ADLINK. Ensure that the fol-
lowing items are included in the package.
DLAP-211 unit
Screw pack
VESA mount kit (plus optional DIN rail kit if applicable)
>60W Power adapter
2.2
Cooling Considerations
All heat-generating components of the DLAP-211 are located on
the left side of the system. These components directly contact the
heat sink via thermal pads to dissipate heat. To maximize effi-
ciency of heat dissipation, maintain a minimum of 2 inches (5cm)
clearance on the top of the DLAP-211.
Summary of Contents for DLAP-211-JNX Series
Page 8: ...viii List of Tables This page intentionally left blank ...
Page 10: ...x List of Figures This page intentionally left blank ...
Page 26: ...16 Introduction Orientation Insert the SIM and SD cards with the orientations shown below ...
Page 42: ...32 Using the System This page intentionally left blank ...