1
2
1
2
Getting Started
Loading Transfer Ribbon
16
2.
First slide the ribbon roll onto the right hand supply spindle. Push the right spindle in and
swing the left side of the ribbon roll onto the left side ribbon spindle. Rotate the ribbon roll on
the left spindle till it locks the ribbon roll’s core notches onto the spindle.
Rotate the roll until the notches align and lock into the left side of the supply hub.
3
3
4
4