![ADJ FOCUS SPOT 6Z User Manual Download Page 8](http://html1.mh-extra.com/html/adj/focus-spot-6z/focus-spot-6z_user-manual_2851934008.webp)
8
INSTALLATION
DO NOT INSTALL THE FIXTURE IF YOU ARE NOT QUALIFIED TO DO SO!
Fixture MUST be installed following all local, national, and country commercial electrical and con-
struction codes and regulations.
Before rigging/mounting a single fixture to any metal truss/structure or placing the fixture(s) on any
surface, a professional equipment installer MUST be consulted to determine if the metal truss/
structure or surface is properly certified to safely hold the combined weight of the fixture(s), clamps,
cables, and accessories.
Maximum ambient operating temperature is -113°F (45°C).
Fixture(s) should be installed in areas outside walking paths, seating areas, or areas where unauthor-
ized personnel might reach the fixture by hand.
NEVER stand directly below the fixture(s) when rigging, removing, or servicing.
Overhead fixture installation must always be secured with a secondary safety attachment, such as an
appropriately rated safety cable that can hold 10 times the weight of the fixture. Allow approximately
15 minutes for the fixture to cool down before serving.
Summary of Contents for FOCUS SPOT 6Z
Page 1: ...User Manual FOCUS SPOT 6Z...
Page 34: ...34 GOBOS...
Page 35: ...35 COLOR WHEELS...
Page 38: ...38 DIMENSIONAL DRAWINGS Drawings may not be shown to scale...
Page 40: ......