Installing LYNXR/LYNXR24
Installation and Electrical Connections
Step
Action
1.
Install the LYNXR/LYNXR24 as follows:
a.
Separate the front assembly from the back plate and disconnect the cable from the front assembly board.
Note: Disconnect the cable only from the front assembly board, not from the terminal block PC board
.
b.
Mount the back plate.
2.
Make wiring connections as follows:
a.
Connect the incoming phone line to either the 8-position jack or terminals 2 (TIP) and 3 (RING).
b.
Connect the handset phone lines to either the RJ11 jack or terminals 4 (TIP) and 5 (RING).
Note: For full line seize operation, see the installation instructions.
c.
If used, connect a piezo sounder to terminals 10 (+) and 11 (–).
d.
If used, connect a bell to terminals 11 (–) and 12 (+).
e.
If using Powerline Carrier Devices, connect com/data/sync/ lines from the 1332X10 transformer to terminals 9,
13, and 14 respectively.
Note: Install Powerline Carrier Devices according to their instructions.
f.
Connect wires from the 1332/1332X10 (1332CN) AC Transformer to terminals 15 and 16.
3.
Make battery connections as follows:
a.
Remove battery retainer and insert battery pack into back plate.
b.
Install battery retainer, and connect battery connector to receptacle on terminal block PC board.
c.
Carefully reconnect the ribbon cable to the front assembly PC board connector (properly aligning the red wire).
d.
After all wiring connections have been made, snap the front assembly to the back plate so it is held by the locking
tabs.
e.
Plug the transformer into a 24-hour, 110VAC unswitched outlet.
Note: Rechargeable batteries may take up to 48-hours to fully charge. “LOW BAT” message should clear within four
hours, or by entering Test Mode.
DISCONNECT
THIS END ONLY!
01000-003-V0
M
X
X
X
X
K
5
10
8
RED WIRE
MARKING
16
1
LOCKING TABS
01000-007-V0
1
BATTERY
RECEPTACLE
WIRING
TERMINALS
M
XX
XX
K5108
RETAINER
BATTERY
PACK
16
-2-