background image

Installing LYNXR/LYNXR24

Installation and Electrical Connections

Step

Action

1.

Install the LYNXR/LYNXR24 as follows:

a.

Separate the front assembly from the back plate and disconnect the cable from the front assembly board.

Note:  Disconnect the cable only from the front assembly board, not from the terminal block PC board

.

b.

Mount the back plate.

2.

Make wiring connections as follows:

a.

Connect the incoming phone line to either the 8-position jack or terminals 2 (TIP) and 3 (RING).

b.

Connect the handset phone lines to either the RJ11 jack or terminals 4 (TIP) and 5 (RING).

Note: For full line seize operation, see the installation instructions.

c.

If used, connect a piezo sounder to terminals 10 (+) and 11 (–).

d.

If used, connect a bell to terminals 11 (–) and 12 (+).

e.

If using Powerline Carrier Devices, connect com/data/sync/ lines from the 1332X10 transformer to terminals 9,
13, and 14 respectively.

Note:  Install Powerline Carrier Devices according to their instructions.

f.

Connect wires from the 1332/1332X10 (1332CN) AC Transformer to terminals 15 and 16.

3.

Make battery connections as follows:

a.

Remove battery retainer and insert battery pack into back plate.

b.

Install battery retainer, and connect battery connector to receptacle on terminal block PC board.

c.

Carefully reconnect the ribbon cable to the front assembly PC board connector (properly aligning the red wire).

d.

After all wiring connections have been made, snap the front assembly to the back plate so it is held by the locking
tabs.

e.

Plug the transformer into a 24-hour, 110VAC unswitched outlet.

Note:  Rechargeable batteries may take up to 48-hours to fully charge. “LOW BAT” message should clear within four

hours, or by entering Test Mode.

DISCONNECT 

THIS END ONLY!

01000-003-V0

M

X

X

X

X

K

5

10

8

RED WIRE

MARKING

16

1

LOCKING TABS

01000-007-V0

1

BATTERY

RECEPTACLE

WIRING

TERMINALS

M

XX

XX

K5108

RETAINER

BATTERY

PACK

16

-2-

Reviews: