background image

ADCP-96-123 • Issue 1 • May 2007

Page 4

© 2007, ADC Telecommunications, Inc.

Install the cable conduit from below and position it so that the top of each upward bend will be
located within the PMF opening at the indicated point. When installed, the top of the conduit
should be located 1 to 2 inches (2.54 to 5.08 cm) 

below

 the top of the finished concrete pad.

Install the conduit 

before

 pouring the pad. 

Figure 2. Constructing the Concrete Pad for the FDH 3000 Small Size Cabinet

REINFORCED

CONCRETE PAD

6.0 IN.

(15.2 CM) 

4.0 IN. MIN.

(10.2 CM)

GRAVEL OR EQUIVALANT FILL

COMPACTED SOIL

21936-A

90º BEND

IN DUCT

PAD MOUNT FRAME

CAST IN PLACE

4 IN. DUCT FOR

DISTRIBUTION CABLE

(LOCATE 1 - 2 INCHES

BELOW TOP OF PAD)

GROUND ROD

(LOCATE 1 - 2 INCHES

BELOW TOP OF PAD)

18.0 IN.

(45.7 CM)

8.0 IN.

(20.3 CM)

4 IN. DUCT FOR

FEEDER CABLE

(LOCATE 1 - 2 INCHES

BELOW TOP OF PAD)

38.6 IN.

(97.9 CM)

36.8 IN.

(93.5 CM)

TOPSOIL OR

DECORATIVE ROCK

TOP OF PMF SHOULD BE

FLUSH WITH TOP OF CONCRETE

11.75 IN.

(29.8 CM)

GRADE

8.0 IN.

(20.3 CM)

17.5 IN.

(44.5 CM)

12.5 IN

(31.8 CM)

DO NOT POUR

CONCRETE INSIDE

PAD MOUNT FRAME 

CABINET FRONT

Summary of Contents for OmniReach FDH 3000

Page 1: ...EM INSTALLATION 6 6 CUSTOMER INFORMATION AND ASSISTANCE 7 _________________________________________________________________________________________________________ INTRODUCTION This publication descri...

Page 2: ...and are listed in descending order of severity of injury or damage and likelihood of occurrence PAGE IDENTIFIER DESCRIPTION OF CHANGE Original Danger Danger is used to indicate the presence of a hazar...

Page 3: ...ation Depending on the landscaping requirements the top surface of the concrete pad may be located from 0 to 3 inches 7 6 cm above the surrounding grade 3 BASE CONSTRUCTION AND CONDUIT INSTALLATION Pr...

Page 4: ...for the FDH 3000 Small Size Cabinet REINFORCED CONCRETE PAD 6 0 IN 15 2 CM 4 0 IN MIN 10 2 CM GRAVEL OR EQUIVALANT FILL COMPACTED SOIL 21936 A 90 BEND IN DUCT PAD MOUNT FRAME CAST IN PLACE 4 IN DUCT F...

Page 5: ...to construct the concrete pad 1 Build a wood form for the concrete pad using 2 x 6 framing lumber as shown in Figure 4 2 Locate the PMF using the dimensions provided in the construction diagram see F...

Page 6: ...electrical codes Check local codes for grounding system installation use of clamps wire size and any other grounding requirements Typically 6 AWG copper wire is used for the ground wire If the ground...

Page 7: ...123 Issue 1 May 2007 Page 7 Connect the grounding wire to the grounding system Leave sufficient slack in the grounding wire to allow it to be routed into the cabinet after the cabinet is mounted on t...

Page 8: ...cation may be verified at any time by contacting ADC s Technical Assistance Center ADC Telecommunications S PORE PTE LTD 100 Beach Road 18 01 Shaw Towers Singapore 189702 ADC Telecommunications INC PO...