ADCP-96-123 • Issue 1 • May 2007
Page 4
© 2007, ADC Telecommunications, Inc.
Install the cable conduit from below and position it so that the top of each upward bend will be
located within the PMF opening at the indicated point. When installed, the top of the conduit
should be located 1 to 2 inches (2.54 to 5.08 cm)
below
the top of the finished concrete pad.
Install the conduit
before
pouring the pad.
Figure 2. Constructing the Concrete Pad for the FDH 3000 Small Size Cabinet
REINFORCED
CONCRETE PAD
6.0 IN.
(15.2 CM)
4.0 IN. MIN.
(10.2 CM)
GRAVEL OR EQUIVALANT FILL
COMPACTED SOIL
21936-A
90º BEND
IN DUCT
PAD MOUNT FRAME
CAST IN PLACE
4 IN. DUCT FOR
DISTRIBUTION CABLE
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
GROUND ROD
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
18.0 IN.
(45.7 CM)
8.0 IN.
(20.3 CM)
4 IN. DUCT FOR
FEEDER CABLE
(LOCATE 1 - 2 INCHES
BELOW TOP OF PAD)
38.6 IN.
(97.9 CM)
36.8 IN.
(93.5 CM)
TOPSOIL OR
DECORATIVE ROCK
TOP OF PMF SHOULD BE
FLUSH WITH TOP OF CONCRETE
11.75 IN.
(29.8 CM)
GRADE
8.0 IN.
(20.3 CM)
17.5 IN.
(44.5 CM)
12.5 IN
(31.8 CM)
DO NOT POUR
CONCRETE INSIDE
PAD MOUNT FRAME
CABINET FRONT