Installation and Test
SCP-FCS717-042-03H
14
January 6, 2003
FCS-717 List 4B
Split Battery Feed.
For a split battery feed do the following (see
):
1
Remove and discard the jumper between TB1 and TB2.
2
Connect the wire from CO battery A to TB1 (-48V_A) termination point.
3
Connect the wire from CO battery B to TB2 (-48V_B) termination point.
4
Connect the wire from CO battery return A to TB4 (RTN_A) termination point.
5
Connect the wire from CO battery return B to TB3 (RTN_B) termination point.
6
Connect the CO battery return wire from TB4 on the COT shelf to the CO battery return termination point.
7
Connect the CO battery return wire from TB3 on the COT shelf to the CO battery return termination point.
8
Connect the CO battery wires from TB1 (-48V_A) and TB2 (-48V_B) on the COT shelf to the equipment bay
fuse panel termination points.
Figure 6.
Connecting a Split Battery Feed
When using a split battery feed, -48V_A provides the battery feed for system 1 and 2,
and -48V_B provides the battery feed for system 3.
When the FCS-717 List 4B COT shelf is configured for a split battery feed, insert a
5 amp fuse into the equipment bay fuse panel for each circuit where the PG-Flex CO
battery wires are terminated.
TB4
RTN_A
CO Battery Return A
CO Battery Return B
CO Battery A
CO Battery B
Equipment Bay
Fuse Panel
TB3
RTN_B
TB1
-48V_A
TB2
-48V_B
Jumper (removed)
5 AMP