@Adam Equipment Company 2005
16
board and also if the link between K1 and K5, if any. Install the micro-
processor and the links in the same way as it was in the old board into the
new board. Be very careful not to bend the legs while removing the micro-
processor.
•
Plug the cables coming from the Load-cell, Display, Battery and Power
Switch into the main PCB.
•
Turn the scale on to check whether the scale is working. Note that without
the pan installed the scale may not show zero.
•
Replace the cover back and secure it with all 5 screws.
•
Place the stainless steel pan back on the scale.
•
Switch the scale on to verify proper installation.
•
Set the parameters as described in the Service Manual and perform the
Factory Calibration by using the
[Limit]
and
[%]
keys together.
•
If the RS-232 needs to be disabled or configured, follow the procedure for
parameter settings as given in the manual.
9.0 SCHEMATICS
The following schematics are included as a guide for the experienced Service
Technician. If you are not experienced we do not advice you to change parts on the
circuit boards or otherwise disturb the electronics.
If you require assistance please contact your dealer or Adam Equipment. We will be
happy to help you resolve problems or determine the cause of a problem if you send
us a full description of the scale and the problem.
The following schematics are included.
CBW Main PCB assembly, pages 2
Summary of Contents for CBW 100a
Page 17: ...Adam Equipment Company 2005 17...
Page 18: ...Adam Equipment Company 2005 18...