AD GREEN TOBY 20 KW Directions For Usage And Maintenance Download Page 14

5.4

Seven days timer

5.4.1

Activation of the seven day timer

With a help of seven day timer it is possible to program automatic turn on and off of the boiler up to
twice a day. Press B3 for 2 seconds. Display will show: TEN OFF. Press shortly B3. Now you can chose
between ON and OFF with B4 and B5. With B3 you can confirm if the timer is ON or OFF.

5.4.2

Setting the clock

Pressing B4 you chose day in the week. 1 - Monday, 2 - Tuesday, 3 - Wednesday, 4 - Thursday, 5 - Friday,
6 - Saturday, 7 - Sunday. We chose current day in the week first. If today is Tuesday than chose 2 and
confirm with B3. Now we press B4 to set time. After B3 again to confirm. Same thing for minutes.

5.4.3

Setting first daily turning on/off time

Pressing B4, display should show P1A. Press B3. Clock will start to pulsate. Press B4/B5 to set time of
ignition. Confirm with B3. Same procedure with minutes. Pressing B4, P1D is displayed. Pressing B3
turn off clock will start to pulsate. Pressing B4 or B5 time is set. With B3 its confirmed. Same procedure
for minutes.

5.4.4

Setting second daily turning on/off time

Pressing B4 display will show P2A. Now the procedure is the same as for P1A.

5.4.5

Setting day for turning on/off time

Display should show DAY1, Pressing B3, the display with pulsate P1, with B3 we confirm. The display
will now pulsate P2. We confirm with B3.

For all days same procedure. When we confirm all days, display will show TEN OFF or TEN ON.

With B3 we confirm turning on/off a seven day timer.

5.5

Boiler cleaning and maintenance

Pellet combustion means total combustion in this case. Little ash remains in the boiler. It is necessary to
clean the boiler only once, maybe twice a week. Detailed cleaning once in a month and when the heating
period is over. Regular maintenance of the boiler means:

Every day, pull the handle up and down on the front side of the boiler. This is to force the ash to fall

dawn from the vertical tube heat exchanger into lower part of the boiler.

1. Emptying the ash from the bottom of the boiler (using the ash tray delivered with boiler)

2. Removing ash layers in the heating chamber if such

3. Cleaning the retort burner (round plate where pellets are falling in)

4. Cleaning the plate which is carrying the retort burner

Regular maintenenace will make your boiler last longer.

If bad quality pellet is used, with addititions such as earth, dust, sand, silicate layer will show

up in the boiler preventing the normal function of the boiler.

If dirty parts are not removed, boiler will start to decay very fast.

This boiler is aimed only for 100% wood pellets.

13

Summary of Contents for TOBY 20 KW

Page 1: ...Compact Size Automatic Sub Pressure Wood Pellet Boiler TOBY 20 30 KW Directions for usage and maintenance August 22 2012...

Page 2: ...on method 2 9 4 5 Fitting the boiler to an open central heating system 10 5 Firing the boiler 11 5 1 Regulation panel of the TOBY boiler 11 5 1 1 Buttons description 11 5 1 2 Messages on the panel 12...

Page 3: ...1 Boiler data 2...

Page 4: ...r is completely air proof so that air flow in the boiler is fully controlled by the exhausting fan mounted on the back Boiler regulation completely controls the quantity of the air inside the heating...

Page 5: ...fan Boiler parts II 1 Opening to place pellets into pellet storage 2 Pellet storage bigger unit 3 Slope to force pellets slide into the smaller storage 4 Opening of the smaller storage pellets fall i...

Page 6: ...cratched somewhere and whether all parts of the boiler stand in their proper position 2 2 Delivery range Together with the boiler also the following parts are supplied Cleaning kit with an external as...

Page 7: ...he mounting of the central heating system and not by the boiler manufacturer sales representative or seller While in use some parts of the boiler may be hot Don t touch the boiler without appropriate...

Page 8: ...The only purpose of the chimney is to take out the flue gases Therefore there are no requirements for chimney height or diameter as with conventional solid fuel boilers This boiler requires a vertica...

Page 9: ...ounted near the boiler It is essential to have a thermometer and a manometer installed to the system It is recommended to install an anticondensation valve on the return line 3 way mixing valve It is...

Page 10: ...be as short as possible Fit the expansion vessel in horizontal alignment to the pipe to ensure equal distribution of pressure The volume of the expansion vessel is determined by the output capacity of...

Page 11: ...itional equipment such as expansion vessel and safety valve please refer to manuals delivered with those products 4 5 Fitting the boiler to an open central heating system The connecting scheme of an o...

Page 12: ...ire installation Diameter for the pipework of the expansion vessle line should be round 25 mm Open expansion vessel is to be positioned vertically above the highest heating element 5 Firing the boiler...

Page 13: ...om Don not open front door Boiler is ready for normal functioning If it is the first ignition only qualified person is allowed to start up the boiler The end user should be present and tought by a qua...

Page 14: ...ff time Display should show DAY1 Pressing B3 the display with pulsate P1 with B3 we confirm The display will now pulsate P2 We confirm with B3 For all days same procedure When we confirm all days disp...

Page 15: ...OBY is fulfilling the most rigorous norms regarding emissions This paper shows typical values for flue gas temperature as well as emission concentration of various gases such as CO COX or NOX All valu...

Page 16: ...f Serbia with full responsibility confirm that Wood pellet boilers TOBY 20 KW TOBY 30 KW made in 2012 are with its construction performance and production way in conformity with conditions prescribed...

Reviews: