4. Boiler valve.

The safety pressure valve must always be positioned and mounted close to the boiler. It

must be easily identifiable and allow for easy access. The safety pressure valve must be set to a nominal
pressure of 2.5 bar. The valve must open and operate smoothly at 2.5 bar. Diameter for the aperture
at the seat of the valve must be at least 15mm. Connecting pipework to the boiler must be as short
as possible. Welds, joints or any possible blockage to this pipe-work must be prevented. Bends in the
pipe-work should be avoided if possible. Unavoidable bends should be of a diameter r>3D (D = radius
of curvature) and less than

α

> 90 ˚C .

The closed expansion vessel shall be fitted close to the boiler. Connecting pipework should

be as short as possible. Fit the expansion vessel in horizontal alignment to the pipe to ensure equal
distribution of pressure. The volume of the expansion vessel is determined by the output/capacity of the
boiler. A ratio of 1 kW:1 litre should be used. The safety pressure valve and the expansion vessel should
be fitted in close proximity to each other, in the following order: expansion vessel closest to the boiler,
followed by the safety pressure valve.

In the event of power failure and the boiler fails to operate correctly – any sudden increase of

pressure will be controlled first by the expansion vessel, on any further increase in pressure the safety
pressure valve will open.

4.4.2

Installation method 2

To be used in the case of the boiler being positioned and installed at a lower level than the installed

pipework and radiators.

As shown on Figure, following elements are connected along the FLOW:

1. Automatic air vent

9

Summary of Contents for TOBY 20 KW

Page 1: ...Compact Size Automatic Sub Pressure Wood Pellet Boiler TOBY 20 30 KW Directions for usage and maintenance August 22 2012...

Page 2: ...on method 2 9 4 5 Fitting the boiler to an open central heating system 10 5 Firing the boiler 11 5 1 Regulation panel of the TOBY boiler 11 5 1 1 Buttons description 11 5 1 2 Messages on the panel 12...

Page 3: ...1 Boiler data 2...

Page 4: ...r is completely air proof so that air flow in the boiler is fully controlled by the exhausting fan mounted on the back Boiler regulation completely controls the quantity of the air inside the heating...

Page 5: ...fan Boiler parts II 1 Opening to place pellets into pellet storage 2 Pellet storage bigger unit 3 Slope to force pellets slide into the smaller storage 4 Opening of the smaller storage pellets fall i...

Page 6: ...cratched somewhere and whether all parts of the boiler stand in their proper position 2 2 Delivery range Together with the boiler also the following parts are supplied Cleaning kit with an external as...

Page 7: ...he mounting of the central heating system and not by the boiler manufacturer sales representative or seller While in use some parts of the boiler may be hot Don t touch the boiler without appropriate...

Page 8: ...The only purpose of the chimney is to take out the flue gases Therefore there are no requirements for chimney height or diameter as with conventional solid fuel boilers This boiler requires a vertica...

Page 9: ...ounted near the boiler It is essential to have a thermometer and a manometer installed to the system It is recommended to install an anticondensation valve on the return line 3 way mixing valve It is...

Page 10: ...be as short as possible Fit the expansion vessel in horizontal alignment to the pipe to ensure equal distribution of pressure The volume of the expansion vessel is determined by the output capacity of...

Page 11: ...itional equipment such as expansion vessel and safety valve please refer to manuals delivered with those products 4 5 Fitting the boiler to an open central heating system The connecting scheme of an o...

Page 12: ...ire installation Diameter for the pipework of the expansion vessle line should be round 25 mm Open expansion vessel is to be positioned vertically above the highest heating element 5 Firing the boiler...

Page 13: ...om Don not open front door Boiler is ready for normal functioning If it is the first ignition only qualified person is allowed to start up the boiler The end user should be present and tought by a qua...

Page 14: ...ff time Display should show DAY1 Pressing B3 the display with pulsate P1 with B3 we confirm The display will now pulsate P2 We confirm with B3 For all days same procedure When we confirm all days disp...

Page 15: ...OBY is fulfilling the most rigorous norms regarding emissions This paper shows typical values for flue gas temperature as well as emission concentration of various gases such as CO COX or NOX All valu...

Page 16: ...f Serbia with full responsibility confirm that Wood pellet boilers TOBY 20 KW TOBY 30 KW made in 2012 are with its construction performance and production way in conformity with conditions prescribed...

Reviews: