2
1
X 4
X 1
23
0
V
- 5
0
H
z
Ch
ar
gi
ng
p
um
p(
s)
N
TC
PRESTIGE 42-50-75-100-120 Solo : A1007856 - 664Y6200 • G
en
32
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
REMOVAL AND INSTALLATION OF THE FRONT AND TOP PANELS
Set-up conditions
• External power supply isolated
Removal Procedure
Front panel:
1. Release the screw (
1
) located at the bottom of the front panel. Retain for reinstallation.
2. Pull slightly the panel bottom towards you, then lift the whole panel to disengage the two up-
per lugs from the boiler casing mounting slots.
Top panel (Prestige 100-120 Solo only):
To remove the top panel, the front panel must be removed.
1. Release four screws (
2
). Retain for reinstallation.
2. Lift the top panel to remove it from the boiler.
Installation procedure
Top panel (Prestige 100-120 Solo only):
1.
Put top panel in place and fasten using
four retained screws (
2
).
Front panel:
To install the front panel, the top
panel must be installed
(Prestige
100-120 Solo only)
.
1. Hold the front panel at a slight angle to
engage the upper lugs of the front pan-
el in the boiler casing mounting slots.
2. Lower panel in the slots and push the
bottom of the panel toward the boiler.
3. Install screw (
1
) retained at removal.
Follow-on tasks
None
ELECTRICAL CONNECTION