SAFETY INSTRUCTIONS FOR THE INSTALLATION
Essential recommendations for safety
•
Install the boiler on a level base or vertically plumb support made of non-
combustible materials and of sufficient strength to support the boiler weight.
•
Use extreme care not to drop the boiler or cause bodily injury while lifting or
mounting the boiler onto the wall bracket or base. Once mounted, verify that the
boiler is securely attached to the bracket and wall or safely set on its base.
•
Do not use or store any flammable, explosive or corrosive products, such as paint,
solvents, salts, chloride products and other detergent products near the appliance.
•
Make sure that all air vents are unobstructed at all times.
Essential recommendations for the electrical safety
•
Only an approved installer is authorized to carry out the electrical connections.
•
Make sure that the appliance is connected to the earth.
•
Install a 2-way switch and a fuse or circuit breaker of the recommended rating
outside the appliance, so as to be able to shut power down when servicing the
appliance or before performing any operation on it.
•
Isolate the external electrical supply of the appliance before performing any
operation on the electrical circuit.
•
This appliance is not intended for use by persons (including children) with reduced
physical, sensory or mental capabilities, or lack of experience and knowledge,
unless supervised or unless they have been given instruction concerning the use
of the appliance by a person responsible for their safety.
Essential recommendations for the correct operation of the appliance
•
All connections (electrical, flue pipe, hydraulic, gas/fuel) must be carried out in
accordance with current standards and regulations in force.
•
The boiler must be installed in a dry and protected area, with an ambient
temperature comprised between 0 and 45°C.
•
Install the appliance to ensure easy access at all times.
•
Make sure that the mains water used to fill the boiler has a minimum pressure of 1.2 bar.
•
Make sure to install a pressure reducing valve set at 4.5 bar if the mains supply
pressure is in excess of 6 bar.
•
If works need to be performed (in the boiler room or close to the air vents), make
sure to turn off the boiler to prevent dust from entering and accumulating in the
boiler heating system.
GAS
pressure
(mbar)
N1 - N2 - N3 eco : A1005170 - 664Y7700 • B
en
14
EN
FR
NL
ES
IT
DE
PL
RU
INSTALLATION
PACKAGE CONTENTS
The appliances are tested and packaged on a wooden support. They are are delivered with a burner to
be installed.
At product reception and after removal of packaging, check the package contents and that
the appliance is free of damages.
TOOLS REQUIRED FOR THE INSTALLATION
Contents of package
• N eco boiler.
• Boiler Multilingual Installation, Operation and
Maintenance Instructions.
• Oil burner
• N1 eco with BMV3 burner,
• N2 eco with BMV4 burner
• N3 eco with BMV5 burner.
• Burner Multilingual Installation, Operation and
Maintenance Instructions