background image

 

Summary of Contents for B-8

Page 1: ......

Page 2: ...ay Hint This gives the user suggestions and advises to facilitate the execution of certain tasks Attention Additional information is supplied to the user and possible problems are indicated Warning Wa...

Page 3: ...al heating system 7 4 1 3 Flue gas outlet 7 4 1 4 Electrical installation 8 4 1 5 Filling the central heating system 9 4 1 6 Mounting the burner 10 4 1 7 Connecting the oil filter and oil burner 11 4...

Page 4: ...ation These boilers are not designed for direct heating of the rooms in which they are installed 1 3 Product description The B Series boilers heat the central heating water by means of a pressure jet...

Page 5: ...be complied with when operating the B Series boilers Measures for a safe installation Don t store any flammable and or gaseous products in the room where the boiler is installed to avoid explosions a...

Page 6: ...burner Store the boiler standing up Store the boiler on a firm horizontal base 4 Installing and preparing for first use In this chapter you will find directions and hints for a correct placement and f...

Page 7: ...arts where contact with human body parts is possible For a correct flue gas outlet the following points need to be observed Use the proper length diameter dimensions use a diameter equal to the diamet...

Page 8: ...5 elbows of 90 The maximum allowed length is 10 metres Every elbow of 90 counts as 1 metre Outside use double walled chimney pipe Hint To reduce the noise resulting from flames it is wise to install...

Page 9: ...res to points 5 and 6 of the connector should conform to the values in table 1 Table 1 Distance to the battery Core diameter 6 metres 6 mm 15 metres 10 mm 4 1 5 Filling the central heating system The...

Page 10: ...a B12 you need to saw an extra piece off the flange The mounting of the burner is done in the following way 1 Place the nut for the flange bolt in the dedicated position and place the gasket 2 Mount...

Page 11: ...nnect the fuel line from the tank to the filter 5A The fuel line must have a outer diameter of 8mm and must be made from copper or steel The fuel has to be connected directly to the oil tank Correct f...

Page 12: ...button 8 and return to 5 4 repeat if necessary 5 9 Close the bleeding 3B when only oil and no bubbles come out of the hose Attention The oil burner is tested by the manufacturer not adjusted The adjus...

Page 13: ...pes with a thin metal strip Attention Don t use any aggressive solvents like thinner or gasoline 1 9 Clean the boiler with a vacuum cleaner 1 10 Replace the boiler top if necessary use a new gasket 1...

Page 14: ...ection 1 1 1 5 4 1 1 2 2 2 2 IP value 50 11 Burner 230 V 24 V 2 B009 3 C012 2 B010 3 C013 2 B011 3 C014 2 B012 3 C015 2 B013 3 C016 2 B014 3 C017 2 B014 2 B016 2 B017 Nozzle 60 0 30 0 40 0 50 0 85 1 0...

Page 15: ...ation pump 13 Seal Two 1 or bigger 14 Knee inner x outer thread Different per type 1x1 1 x1 or 1 x1 15 Pressure valve pressure gauge fill drain cock 16 T connection 1 x x1 Only for B 12 17 Fire inspec...

Page 16: ...User manual Kabola B serie 1 4 2005 16 Appendix C Electrical diagram B8 B70 230V...

Page 17: ...User manual Kabola B serie 1 4 2005 17 Appendix D Electrical diagram B80 B100 230V...

Page 18: ...User manual Kabola B serie 1 4 2005 18 Appendix E Electrical diagram B8 B45 24V...

Page 19: ...f flame protection Flame protection defect photo cell Replace flame protection Burner starts pulsing Flue glass flow interrupted Clear chimney opening Boiler dirty Clean boiler Oil supply interrupted...

Page 20: ...User manual Kabola B serie 1 4 2005 20 Appendix G CE declaration...

Reviews: