background image

EN • 13

664Y4600 • D

E

N

FR

R

U

P

L

DE

IT

ES

N

L

descrIPtIon

DESCRIPTION OF OPERATION

THE TANk-IN-TANk CONCEPT
The Etech’s series differs from traditional hot water producers in that 
it has a tank immersed in the primary fluid contained in the outer 
body.
When there is a temperature drop in the boiler because the central 
heating system or the domestic hot water circuit needs hot water, the 
internal thermostat starts up the power on the immersed electrical 
resistors. The heating elements quickly heat up the primary fluid, thus 
creating a natural circulation around the tank.

INDIRECTLY HEATING DOMESTIC HOT wATER
This circulation allows easier heat exchange between the primary fluid 
and the domestic water, all over the tank surface. The corrugations 
on the outer shell of the tank increase the area of heat exchange still 
further and thus speed up the process of heating the domestic water.

EASY TO SET AND TOTALLY SAfE
With a single command, the water temperature of both the primary 
circuit and the domestic hot water circuit can be set by the adjustable 
thermostat situated underneath the tank in the primary circuit.
A cut-off thermostat, placed on the top of the boiler, automatically 
switches off the power when the temperature of the water in the 
primary  circuit  reaches  95°  C.  A  manually  reset  safety  thermostat 
switches off the system if the temperature reaches 103° C.

BUILD FEATURES

OuTER BODY
The outer body containing the primary fluid is made of thick STW 22 
steel.

TANk-IN-TANk TYPE EXCHANGER ACCuMuLATOR
The internal tank which has a large heating surface for the production 
of domestic hot water is made of Chrome/Nickel 18/10 stainless 
steel. It is corrugated all the way up using an exclusive manufacturing 
process and is entirely argon arc welded using the TIG (Tungsten Inert 
Gas) process.

INSuLATION
The boiler body is fully insulated by rigid polyurethane foam, with a 
thickness of 70mm, with a high thermal insulation coefficient. This is 
sprayed onto the tank without using any CFCs.

JACkET
The boiler is covered by a steel jacket which has been scoured and 
phosphated before being stove finished at 220° C.

HEATING ELEMENTS
nding on the model, the boiler is fitted with either six or seven 
detachable stainless steel AISI 304L immersion heaters.

OVERVIEW

•  Combination boiler (central heating and domestic hot water).
•  Tank-in-Tank indirect storage type domestic hot water production.
•  The central heating connections are designed so that they can be 

connected in all three directions, this means that the boiler can be 
installed against a wall or in a corner without having to leave any 
free space .

•  Internal two-stage temperature control thermostat, which allows 

the power to be adapted according to actual heat requirements.

•  The day/night function allows you to store up a volume of water 

at a high temperature during cheap rate periods (at night) and use 
the energy stored up in this way at peak rate times (during the 
day).

•  The  boiler  is  fitted  with  expansion  tanks,  a  safety  valve,  a 

manothermometer, a water low safety device (pressure switch) 
and a circulation pump.

•  E-Tech S boilers have an effective output of 14.4 kW for the 160 

model and 28.8 kW for the 240 and 380 models. These outputs 
can be adjusted either using the power limiting switch on the 
boiler’s control panel or by removing the bridges from the control 
terminal block.

Stainless steel domestic hot water tank

Summary of Contents for E-Tech 160

Page 1: ...160 240 380 Installation Operating and Servicing Instructions EN 1 664Y4600 D EN FR RU PL DE IT ES NL ...

Page 2: ...ests and test procedures may result in personal injury or risks of pollution ACV reserves the right to change the technical specifications and components of its products without prior notice Introduction index INTRODUCTION 2 People who should read these instructions 2 Symbols 2 Warnings 2 installation 3 Boiler room 3 Central heating connection 3 Domestic hot water connection 5 Control wiring diagr...

Page 3: ...e laid on a base made of non combustible materials CENTRAL HEATING CONNECTION The drain cock 9 and safety valve 2 must be connected to the waste water disposal system The boiler is fitted with an expansion chamber with a capacity of 12 liter on E Tech S 160 and 240 models 2 x 8 liter on E Tech S 380 models If the expansion volume is not sufficient for your needs then it is possible to install an a...

Page 4: ...es and also makes sure that there is a always water flowing through the safety unit when refilling the domestic hot water tank Hot water circulation If the tank is located a long way from the point of use then installing a closed recirculation circuit ensures that a faster supply of hot water is always available 2 2 3 5 Description 1 Safety unit 2 Pressure reducer 3 Thermostatic mixing valve 4 Hot...

Page 5: ... Power level switch 1 I Timer J Power level switch 2 K1 Power Relay 1 Level 1 K2 Power Relay 1 Level 2 K3 Power Relay 2 Level 1 L Room thermostat optional M Loading pump 1 2 Life 230V 50Hz 3 4 Neutral 5 6 Time Clock optional 7 8 Safety switch 10 11 Stop Bridge 12 13 Room thermostat optional 14 15 Heating pump optional 17 18 Relay K3 disactivated installation 2 1 3 5 15 17 4 7 9 10 11 12 13 16 19 2...

Page 6: ...h 1 I Timer J Power level switch 2 K1 Power Relay 1 Level 1 K2 Power Relay 1 Level 2 K3 Power Relay 2 Level 1 K4 Power Relay 2 Level 2 L Room thermostat optional M Loading pump 1 2 Life 230V 50Hz 3 4 Neutral 5 6 Time Clock optional 7 8 Safety switch 10 11 Stop Bridge 12 13 Room thermostat optional 14 15 Heating pump optional 17 18 Relay K3 disactivated 19 20 Relay K4 disactivated installation 2 1 ...

Page 7: ...G DIAGRAM E Tech S 380 The control circuit is automatically powered from the power circuit It is also protected by a 3A magneto thermal circuit breaker CONNECTING THE ACCESSORIES for the E Tech S 380 The electrical accessories are connected to the numbered terminals on this diagram below It is important to switch the boiler off before carrying out any work 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Po...

Page 8: ...4 4 kW 12 kW 9 6 kW 7 2 kW TRI PHASE 1 N 2 3 L1 4 L2 5 L3 6 1 N 2 3 L1 4 L2 5 L3 6 1 N 2 3 L1 4 L2 5 L3 6 1 N 2 3 L1 4 L2 5 L3 6 17 18 17 18 17 18 17 18 17 18 17 18 17 18 17 18 installation B Blue Bk Black Or Orange R Red A Safety switch K1 Level 1 power relay 1 K2 Level 2 power raelay 1 K3 Level 1 power relay 2 This appliance must be permanently connected to fixed wiring and must be earthed The w...

Page 9: ...R Bk B K3 A E Tech S 240 28 8 kW 26 4 kW 24 kW 21 6 kW TRI PHASE 1 N 2 L1 3 L2 4 5 L3 6 1 N 2 L1 3 L2 4 5 L3 6 1 N 2 L1 3 L2 4 5 L3 6 1 N 2 L1 3 L2 4 5 L3 6 19 20 19 20 19 20 19 20 19 20 19 20 19 20 19 20 B Blue Bk Black Or Orange R Red A Safety switch K1 Level 1 power relay 1 K2 Level 2 power raelay 1 K3 Level 1 power relay 2 This appliance must be permanently connected to fixed wiring and must b...

Page 10: ...inal block K Power relays L1 L2 L3 N 4 x or 4 x nr 4 x rg 4 x bl T bl rg nr or bl rg nr or bl rg nr or bl rg nr or 4 x or 4 x nr 4 x rg 4 x bl A K K K K C B bl Blue nr Black or Orange rg Red T Green and yellow This appliance must be permanently connected to fixed wiring and must be earthed The wiring must be carried out by a competent person and in accordance with the current IEE Wiring Regulation...

Page 11: ...he summer winter selector the half and full power switches and the control thermostat all to the desired positions After a few days in operation we advise you to check the quality of the electrical connections and also make sure there is no air in either the boiler or the system Switch the power supply off from the outside box before carrying out any work STARTING UP installation ELECTRICAL SAFETY...

Page 12: ...he mains switch installed by the electrician 2 Close the boiler system s isolating valves 1 3 Connect a hose to the drain cock 2 and make sure that it is properly connected 4 Open the drain cock and allow hot water to flow out into the waste water disposal system check that air is being taken into the system by opening the air vent for instance 5 Once you have finished put the drain cocks back int...

Page 13: ...of domestic hot water is made of Chrome Nickel 18 10 stainless steel It is corrugated all the way up using an exclusive manufacturing process and is entirely argon arc welded using the TIG Tungsten Inert Gas process INSULATION The boiler body is fully insulated by rigid polyurethane foam with a thickness of 70mm with a high thermal insulation coefficient This is sprayed onto the tank without using...

Page 14: ...ional Control panel 1 2 7 4 3 8 5 Cutaway boiler 1 7 11 8 6 10 5 2 9 3 4 EN 14 664Y4600 D EN FR RU PL DE IT ES NL description 1 Central heating flow pipe 2 Domestic hot water connections 3 Expansion tank 4 Heating resistors 5 Central heating return 6 Internal stainless steel tank 7 Primary tank 8 Water low safety device 9 Primary safety valve 3bar 10 Rigid polyurethane foam insulation 70 mm 11 Col...

Page 15: ...Peak flow at 40 C T 30 C liter 60 700 1234 1564 Continuous flow at 40 C T 30 C liter h 413 827 827 Tank reffill time at 60 C Initial heating time minutes 36 41 67 After drawing off 140 liters at 45 C minutes 16 12 12 BOILER SPECIFICATIONS E Tech S 160 E Tech S 240 E Tech S 380 Output kW 14 4 28 8 28 8 Operating voltage Volt 3 x 400 N 3 x 400 N 3 x 400 N Heating elements 6 x 2 6 x 2 7 x 2 Total cap...

Page 16: ...ws the temperature to be set manually or if you decide to install a regulator automatically We recommend that you set the thermostat to the maximum values to get the best out of the domestic hot water system There is a risk of burns from hot water The water stored in the domestic hot water tank in the boiler can be at a very high temperature In all cases install the thermostatic mixer on the domes...

Page 17: ...rdisposal system should be open to the atmosphere Make sure there is nobody near the flow of hot water If you notice anything unusual after this short trial please inform the installing engineer BOILER SHUTDOWN If the red light on the control panel lights up this indicates an operating fault 1 Check the boiler pressure it should be between 1 and 2 bar depending on the height of the building 2 Once...

Page 18: ...EN 18 664Y4600 D EN FR RU PL DE IT ES NL ...

Reviews: