ArrowMAX
TM
HOME User's Manual_EN 15
6.3 Installation Steps
(CONT.)
3.1) Flow Sensor Holder
a. As shown in
Figure 7
, connect the clips to the back of the flow sensor board holder.
b. Mount the flow sensor board with holder onto the outlet piping by pushing the clips around
the pipe.
Note: The clips are designed to be mounted on a 1" pipe.
4) Plumbing
Plumb UV Reactor and additional filtration add-ons into the system at this time. Use
metal or PVC pipe, elbows, and reducers to connect the filtration system UV reactor.
Ensure all parts are located in the right position, and water is flowing through in the correct
direction. (
Refer to Figure 2 for overall configuration.
) Once installation is
complete, allow proper time for the glue to dry according to manufacturer instructions.
5) Filtration Installation
For detailed instructions on the filtration type and the number of stages, please
consult with a filtration specialist. The UV system should be the last treatment the
water receives before it reaches the faucet.
The filtration system should maintain a UV transmittance greater than 95%/cm.
6) Check For Leaks
When all plumbing connections have been completed, and you have allowed
proper time for the glue to dry according to manufacturer instructions, slowly
turn on the water supply and check for leaks. Make sure the bypass valves are
functioning properly and that the water is flowing through the UV Reactor.
6. INSTALLATION GUIDE
(CONT.)
Figure 7: Connect the Clips
a.
b.
Summary of Contents for ArrowMAX HOME
Page 2: ......