
23
Device Handling
Connecting an external monitor
CAUTION
Risk of exceeding the leakage currents when connecting
external devices with their own power supply or an electrically
conductive connection to other devices
• Only connect devices that comply with IEC 60601-1 standard or IEC
60950.
• Before initial commissioning, check and document all device combi-
nations according to IEC standard 60601-1.
• Perform this inspection at least once per year according to the legal
requirements.
The monitor port is located on the rear side of the device.
• Using the VK-124 cable, connect the external monitor to the monitor
port. The device has a monitor port for connecting it to an external
monitor with the VK-124 cable. Connect an external monitor with a dis-
play screen of at least 10 inches that can display to a resolution of 1024
x 768 pixels. Set up the monitor so that it can be viewed easily by the
user and is not positioned any further than 1.5 m from the user during
any electrophysiological study. Depending on the display screen size
being used, it may be possible to increase the distance of the user from
the monitor with a resolution of 1024 x 768 pixels.
Summary of Contents for Qubic Force
Page 51: ......